GB BESS buildout Q1 2026: fleet reaches 7.2 GW

Written by:
Modo Energy

GB BESS buildout Q1 2026: fleet reaches 7.2 GW

​Seven batteries came online in Q1 2026, adding 397 MW and 744 MWh to the GB fleet. Total capacity reached 7.2 GW and 11.75 GWh.

Delays due to connections reform could reduce the buildout of storage of battery energy storage by 2.4 by end of 2029. Without delays, Modo Energy projects 22.8 GW by end of 2029. With delays, the base case falls to 20.4 GW. The pipeline sits at 29.9 GW. Whether the market reaches 17 GW or 22 GW depends almost entirely on how quickly the connection queue resolves.

A data download of the battery energy storage project pipeline out to 2029 is available at the end of the article.

For any further information, reach out to the author: shaniyaa@modoenergy.com


Key takeaways

    Download

    Unlock full research potential

    Access the full depth of our energy market research - complete articles, expert analysis, and market reports trusted by industry professionals.

    Already a subscriber?

    Modo Energy (Benchmarking) Ltd. is registered in England and Wales and is authorised and regulated by the Financial Conduct Authority (Firm number 1042606) under Article 34 of the Regulation (EU) 2016/1011/EU) – Benchmarks Regulation (UK BMR).

    Copyright© 2026 Modo Energy. All rights reserved