December 22nd frequency event: How did batteries respond?
On December 22nd 2023, one of the interconnectors between France and the UK (IFA2) tripped at 13:09, causing a sudden shortage of power flowing to the grid. All three frequency response services kicked in at full power to restore system frequency. This resulted in a maximum of 1.2 GW of power being discharged from batteries.
Sign up to read this article for free
Unlimited access to our free articles
Monthly access to 3 Global Research articles
Benchmarks, Forecasts, Ko and more




