Transcript:
I'm your host, Ed Porter. Welcome back to Transmission. When it was switched on, it was the biggest operating battery in Germany. Within eight weeks, the local grid was struggling to keep up with it. The battery was causing congestion problems the grid
couldn't handle. So the choice was simple: accept limits, or the battery couldn't connect to the grid. ECO STOR took the limits, and those rules became the pilot for flexible connection agreements, or FCAs, which are now becoming the standard across Germany. Georg Gallmetzer, managing director of ECO STOR, joins me today to discuss why he thinks grid operators should stay in control.
His argument is that without clear rules on how batteries behave, no grid operator will let them connect at scale. We also get into Germany's new capacity market, and the one rule Georg says will leave German consumers paying more than they need to. For this episode, if you're going live with wind, solar or battery projects in Germany, I'd recommend using Ko, Modo Energy's AI analyst, to set up benchmarks to see how FCA-restricted assets performed today, or to get an FCA-specific revenue forecast generated. Let's jump in.
Welcome to Transmission. Hey, thank you for inviting me. Our pleasure. And as ever, let's get straight into it.
So what is one thing that people get wrong about batteries in Germany? Well, it depends which people you mean. So I think we are in about three parallel realities. Let's start with people from government.
I think they get wrong that BESS is not a cost like a piece of grid or renewables. Any benefit BESS brings into the system is for free for the public, because the investor pays all the bills. So actually, the government should have an incentive to deploy as many BESS as it could. But I don't see this aspect in today's government and regulation.
Unexpectedly, the regulator, the Bundesnetzagentur, is the one pushing BESS. If you look at the metering concept amendment, or AgNes, the grid fee amendment as it's going to be, which is AgNes, AgNes. Yeah, it is very effective what has been regulated, helping BESS to have reliable business foundations from 2029 onwards. Well, let's just pause there because, um, first things first.
I can hear you've got sort of a list of three, which tells me that you're an engineer. Because when you ask engineers for one thing, they always come with a list of three, which is great. But the second thing is this concept of batteries sort of not costing consumers something is really important, right? So somebody, a private enterprise, builds a battery, and then you only really see that battery interacting with the market if it's cheaper than something else.
So if the battery was super expensive and really, you know, really costly to call on, you'd never see it, because it would always be sort of stacked away at too high a price. But because you do see it acting every day, what it's doing is it's always bringing down that price. And something that is so simple, yet often people get wrong. There it is.
Thank you for the summary. You couldn't have said it better. Let's get into the next. Let's do number two.
Of the parallel universes, the next parallel universe is the universe of grid operators. It's a big and important universe, but grid operators get wrong that BESS actually is their only realistic chance to mitigate the exploding grid costs and the eternal connection dates for renewables, and to deliver quick access to the grid for renewables as soon as they can. Why? Because BESS can actually operate in a way that virtually expands the grid access capabilities.
You need to see how grid operators let BESS operate. And if you level out the load profiles, you can access much more PV, and you can actually also rule BESS to reserve access capacity, to give industry the priority without damaging the BESS revenues. I'll give you an example. The actual amendment that I saw, trying it out to demonstrate with several DSOs and TSOs, is the so-called curative dispatch principle.
It is a principle where the TSO or DSO can curatively change the schedules without anticipation and, of course, compensate the lost opportunities. But in this way the TSO and DSO have full control, especially on the charge side of batteries, and allow, even in the case of a fault on the grid, to keep the grid stable and push the battery out of the charge side. In the normal case, this extends the grid by about 30 to 40%, and this is an unleveraged resource. It doesn't cost anything.
It comes for free. It needs a bit of processing and a bit of regulatory introduction. But that is what grid operators get wrong, I think. So, to be, um, maybe a little bit dismissive, the old-fashioned way of a grid operator working would have been to think, okay, we want to connect more demand and more generation.
Okay, let's build more grid. Um, that was kind of always the solution, right? Just get the grid to be bigger. They are incentivised by the regulation scheme to always build bigger grids, but not to be as efficient as they could.
Exactly. So this efficiency thing is really important. And in power markets, I think it's always been understood that better utilisation of the assets generally brings down costs to consumers. And so to play it back to you, you're saying, well, I'm a battery owner, I want to be charging and discharging.
But if you tell me that there's some time that you want industry to have priority, and you just want to ask me to wait for 2 hours or 4 hours, whatever it might be, as long as you let me know and you kind of give me some sort of, um, economic reimbursement. Yeah, exactly. For the sort of lost money. Then I'm happy to shift.
Sure. And then your grid goes from 30 or 40% utilisation to 50% utilisation, much more, and we haven't had to build more grid. Right. Which, you know.
And above all, you can connect now and not in ten years after grid reinforcement, with regard to the new data centre industry that desperately waits for connection dates, and all the other electrification industries that we really need for the success of the transition. Yeah. So you can think of batteries as this skeleton key. You can kind of put them into the grids and unlock more capabilities.
Okay. We're at two of three. Let's do three. The third universe actually is the wild west world of BESS developers.
I think BESS developers do get wrong that there is no free ride on public infrastructure. You know, when BESS developers in 2023 and 2024 came en masse to Germany and they virtually plundered grid capacities, I must say, the grid operators reacted in panic by holding back completely. I think what happened is that both understood that grid and BESS are actually a couple of destiny. They need to come together, because there is no grid operation without BESS.
There's no BESS without grid. But I would say the first date really failed, and we now need to rearrange a kind of etiquette on what the rules are for building up the setting for the new first date. And I think FCAs are a very important set of rules, so-called flexible connection agreements. Connection agreements are a kind of etiquette to let grid operators again find trust in BESS operation, because it defines
how BESS actually behaves, which is something, when you decide to marry, you should first check: the behaviour of your partner. And I think FCAs are a little bit like a behaviour scheme where the grid operator doesn't have to fear the loss of control, because what he fears most is that he, the grid operator, must make sure that the grid stays stable. There's no blackout, there is no brownout. And not knowing batteries' behaviour, he can't let batteries access in the volume that we want.
I'm not talking about hundreds of gigawatts, but even single-digit gigawatts could be, um, dangerous enough to endanger the grid. 50Hertz was here lately and exactly described this principle. And this is really true. And I want to emphasise that we as developers need to respect a certain etiquette, and then come up with a new dating proposal, accepting certain FCA rules and some other rules that are essential for playing that game.
Yeah. So if you want to hear both sides of this date, then you've got this episode, and we're going to get into it in more detail. And then Wilhelm Kiewitt from 50Hertz also came on a few weeks ago and talked about how 50Hertz, one of the four transmission system operators in Germany, was seeing the sort of evolution of batteries and how they were thinking about batteries and where they could get more from them, which is, yeah, it's nice to see sort of two sides of that coin. Okay.
So that's our sort of three parallel universes, what three sets of people get wrong. We've also recently just had the capacity market auction in Germany. Um, what happened? Well, it was, uh, two days ago.
We are recording on the 5th of November. And, uh, the setting was that the German government wanted to start with an allocation of nine gigawatts for gas peakers in two tranches. The first tranche was awarded two days ago, and the result is that 5.1GW were actually awarded, with the big ones, LEAG and RWE, catching 99% of all auction bids.
Why? Because, interestingly, they tendered with brownfield sites, to repurpose phased-out coal sites, importantly phased out and not running in 2031, and that are most cost-efficient to bid into the auction, interestingly. And I really like that aspect. They don't even dismantle their coal site, but they reuse their existing boilers and just change burners from lignite to gas.
I really like it, because they are super inefficient, and inefficiency brings me to the point that they don't interfere with the actual market, which was one of the targets. So as a BESS developer, I don't want any subsidised asset to interfere with wholesale markets and healthy energy-only price signals. That is the feed we live from, and we want it in the market. And these very inefficient, let's say, gas steam boilers, they are not going to bid much, and are reliably there in the Dunkelflaute, which is, you know, the end game, the enemy in the energy transition, where there's no wind, no solar.
Maybe it's cold. Maybe it's dark. We need a lot of power and we need reliable, controllable capacity. And that is where they kick in.
Okay, well, we'll come on to Dunkelflaute in a second. I think, just first, to comment on the types of site repurposing that are going on, that's happening in GB. Um, looking at, say, the Thorpe Marsh power station, that's now being repurposed for a very large battery project by a company called Fidra. If you look at Italy, in the MACSE it was Enel who won lots of projects with their brownfield sites as well.
And so it does make sense, right? People are repurposing these old sites, and that's sort of where the lowest cost to play is coming from. I think maybe going on to the Dunkelflaute, this period where you have low wind, low solar and high demand. Let's talk about that, because it's different in different places across Europe.
So the sort of length of that system tightness really matters, where you are from a geography point of view, and it matters how long it is. And that's important because it will change how much a battery can contribute to it, and how much, say, gas capacity you need. Yeah. No wonder, we are going into an energy system where the weather defines the availability of power.
And well, the weather in Italy is certainly different than in Germany or the UK. And unfortunately in the UK the weather is the worst, in terms of tourism, but you have so much wind. If you look out the window today, it's kind of overcast. Pretty funny, but it's the same in Germany today, so don't worry.
But anyway, um, with the power system being defined by weather, you need to anticipate the weather eventualities and save up for the gaps, and gaps in Germany are a little bit longer and deeper than they may be in other markets, with a lot of wind in the UK or a lot of solar in Italy. So I understand that the so-called resource adequacy, which is the procedure to identify these gaps, turns out to be different in every market. And in Germany, it turns out to be kind of a one-week, two-week, uh, worst-weather-year event that needs to be covered. And that means that when gas units come to get a capacity market contract and batteries come to get a capacity market contract, you'll see the gas units getting, say, 85% of the clearing price, but a battery, depending on its duration, will get something like 20 or 35%, depending on how long the duration is.
Yeah, the duration is a very important question, because I believe we are not at the end of the duration rate we find in the market. I mean, I'm now more than ten years in this battery space, and I started to build out the first, largest battery in Germany back in 2016, with half an hour duration. Uh, the next project we are going to deploy is four-hour duration. So it's, uh, eightfold in ten years or so.
And this is not going to end. So we're going to see, I mean, also your reports show, you're going to see longer-duration assets driven by endogenous build-out, like the price and investment incentives, despite falling curves, maybe also because of falling curves, as the right mitigation strategy to still be an investable business despite falling curves. Yeah, I really like that. If you look actually also at the profiles of the future, it is very difficult to get that data, but an idea of what is the duck curve in the future, I don't believe it's going to be a duck anymore.
I think it is kind of like a castle profile. Something flattened in the day and the evening, with different levels. We totally agree. You kind of get this, um, if you're familiar with the power shape, you kind of see a peak in the morning and a bigger peak in the evening.
And what we see is, as you get a bigger and bigger battery fleet, essentially they start to kind of put a cap on that peak, and this kind of flat tabletop-type behaviour. And that's a perfect investment foundation for long-duration batteries. That's long duration. We're not talking about two weeks.
We are talking about maybe 8 hours or up to 10 hours. And the longer we wait in the future, the more innovation we will see. Because we have survived as an industry ever without subsidies, we had to innovate every time, being in that space for more than ten years. Innovation is a constant, innovation and agility, and that is what ECO STOR is really good at.
We are a fully integrated value chain with a lot of engineers, and we build everything ourselves. We develop everything ourselves. And the one constant is constant innovation, constant change, adaptability. And that is why we believe we will still be in the game in the 2030s, even in flattened- out curves.
And coming back to the capacity market, I mean, that helps even prolong the duration rate, if there is a little incentive on the investment for longer hours, even if the duration factor is low. Yeah. And on this longer duration, there's something almost unique about the German capacity market in the concept of this clawback option. So if you have a, um, if you have a battery that's trying to provide the dispatch, and yet the event runs for a long period of time, then you can have some of your capacity market revenues taken back from you based on a sort of strike price that's set on gas.
How do you think about that? Because that's very unusual. I think a lot of capacity markets are almost seen as being sacred by financiers, and you'll always get that money. But in Germany's case, not so.
Well, Germany would be the first market that strikes the perfect scheme with the first introduction. So of course this is wrong and needs to be corrected. And actually you should spread your analysis. It's really good how you identified an actually quite astonishing error in the regulation scheme, and highlighted the consequences of it on battery bids, which is absolutely, let's say, burning to me, as we Germans say anyway.
We would say eye-watering. But I would, I...
Burning, I think I can get on board with. I'm on fire if I see this mistake, and this must be corrected. And, uh, Modo is doing a good job in highlighting, um, that mistake first. And we're going to propagate the concept until, I think, March, or at least springtime, when the new law is going to be defined and enforced, and we hope to get it done first.
If not, um, probably the next round in the true capacity market is going to be too expensive, inefficiently too expensive, and the end consumer has to pay for it, and therefore it's worthwhile getting a hit on correcting that mistake. That's really where I want to go next. So if you have sort of, um, a particularly painful process that causes batteries to bid higher than they otherwise would, then the person who ends up losing in that situation is the German consumer, right? So maybe taking a step back from the nuance, what's your view on the capacity market's impact on German consumers?
Well, it depends what the consumer wants. If the consumer wants to be protected with the capacity market, he buys kind of an insurance policy against price peaks. If price peak protection is what he's going for, I believe that insurance policy is in vain, because price peak protection you can also get by deployment of the BESS fleet of 20 gigawatts plus we are going to see in the coming years. That will eliminate the peaks that the regulator actually intends to be protected from.
But there is another protection aspect, that is the unintended curtailment of load, where consumers are actually willing to pay to have reliable and secure energy. Nevertheless, there is a disincentive, because the end consumer down at household level is the last one to be curtailed, in terms of, and that is actually the one paying for it, because the energy-intensive industry is probably not going to pay for it, because there will definitely, again, be a kind of exemption discussion for the energy-intensive. So the ones actually being able to be curtailed and providing flexibility to the market too are the ones not paying the bills, and the others being protected, they pay the bill, although they are protected anyway.
So it's a bit non-stringent and illogical in my eyes. And interestingly, it is probably not going to be a flat 0.2 euros per megawatt hour cost of this 12 billion of the auction two days ago, and another, probably even more costly, auction in December. Apparently, the one using the power in times of shortage would have to pay the bill, and it's unclear how this is going to be rolled out.
It looks to me like kind of a dynamic grid fee for using power in a congested time. And that brings me to a point that we already discussed, about dynamic grid fees from an AgNes and grid fee regulation perspective, and we also talk about other price signals for shortages. And I fear that these instruments overlay and they are not coordinated. It would be new to me that anyone out there in the regulation or governmental scheme tries to coordinate all instruments.
And this leads me to the point that the instruments overlapping, they are inefficient too. And I think if I'm a consumer, right, in Germany, and somebody says to me, oh, they're going to try and recover the capacity market cost from me during this period, um, whenever the market gets tight, well, the prices are already high, the network fees will be high, and there's a capacity market charge that's going on. Well, I'm just going to build a battery on my own, at my home or my industry, and try and sneak around the charge. This could be an investment incentive for our industry, you mean?
So the more inefficient the system, the more batteries are being built? Yeah. Well, there's a logic. Kind of, there's a balloon that's being squeezed somewhere, and the revenues popping up in unexpected places.
I mean, we do have a kind of extremity. Extremities in prices are not a tolerable system. So batteries are helping to mitigate that. Let's say it's not a system error, but it's a system, uh, calling for investments, and batteries always help out.
Yeah. Though it probably would be clever to not, um, make mistakes first, and have batteries investing in and solving the problem, and concentrate the industry on the real topic, that is the energy transition. Getting renewables integrated at the lowest cost possible for the consumer. Okay.
Well, maybe next question. If I put you in charge of this process of designing the capacity market, or maybe we can also expand that to sort of the broader rules that exist in the German power market today, what's one thing that you would change, uh, for the power system? Hmm. If it was for the capacity market, I would definitely go for the clawback mechanism, which is an evident error.
If I looked at a larger scale, I mean, we have one price zone, and this other topic, that every FCA, every other rule we are discussing, is kind of a detour and counter-solution to not having split the price zones. Totally. Um, this discussion is very old and is in vain to discuss, since we need to find other ways. It's a political death discussion, but the problems don't disappear because politicians don't like the price zone split, and it's on our table.
It makes things complex and expensive. Yeah, so if you don't go down that locational market route, you then have to have all these other extra things that try and act like locational markets to try
and make it happen. Yeah. Um, which is my favourite German expression: through the back of the chest. The back of the chest.
I'll give you another, uh, another blossom that grows in this discussion. It's the TSOs' idea of actually freezing schedules on intraday continuous. It's a bit nerdy, but actually, in order to still be in the control seat from a TSO point of view, batteries in the future may be frozen on their schedule hours before delivery, in order to deliver better. So batteries lose a lot of opportunity there.
It's crazy. Uh, the discussion is about not compensating this. In my opinion, there must be compensation, and there must be better ways to mitigate. And the answer is, well, a price zone split.
And that is impossible. So batteries in this regard are actually now probably paying a hard price for no price zone split, by this alternative route of freezing schedules. And this has not been discussed fairly so far. And yeah, that's why this is highlighted here.
This is happening in other markets as well. So if you don't have locational signals, what you tend to have is a central dispatcher who then wants more control over the process, and does things like, and will freeze your dispatch profile ahead of time. And just to kind of highlight just how silly that is, you're taking your most flexible asset that can react within seconds, and you're blocking it out of the market where it gets to react to the changes that are happening. Yeah, yeah.
It's crazy. The issue is the batteries are simply too quick for today's processing in congestion management for TSOs and DSOs. Batteries were not asked to come into the game. We just came to a party without being invited.
And here we are. We are so dynamic and so quick. And the threat is seen, of course, first by DSOs and TSOs. I think there are better instruments, or at least these instruments of freezing schedules can be mitigated, to extremities only, and only one side and not both sides, to keep the financial damage low.
And I believe this rationale of keeping the financial damage low is going to prevail, and therefore I don't see it as a fundamental
threat to the industry. But I want to highlight to the industry: look closely at what your TSOs propose next. Yes, firmly agree. And we've been spending a lot of time on this topic as well.
Um, but maybe I'll ask you to swap your hat. So maybe from being an engineer to perhaps going towards sort of commercial, uh, as a commercial head. So when you're building your business case for batteries, how do you think about the revenue streams? You've got sort of day-ahead, intraday, FCR, aFRR.
Where are you willing to sort of place your bets for the future of the battery business case? I place a bet where the Modo index is going to tell me. So we buy your curves, and your curves tell me, well, this is the mix. And if this mix is bankable, we do it.
Or we show this mix to tollers and ask them for a good price. I'm agnostic to the mix. Well, not really. If a customer sees all these mixes, this has a meaning for the vertically integrated value chain, because we need to adapt our systems.
If the curves change and the mix changes, you can't still build the same asset. You need to change your technology, you need to adapt whatever your efficiency means. If you need to cycle heavier and more, energy efficiency becomes really important, and longevity of your asset, because you need more cycles, or, um, the duration rate becomes really crucial. And that is what we are really good at, because with the curves, when they
come in, we instantly look very closely at the new projects and how we can adapt: higher financial performance, higher economic performance, to mitigate the potential risk of curves going down. I mean, to kind of go behind the scenes a little bit of how we see this, we see the market saturating, we see aFRR saturating as well. So kind of the day-ahead, intraday, those markets are really key in terms of making that future stack, which is a little bit why people have gone from the half-hour system that you built in 2016 to now looking at two, four, six- hour systems, because they're building their business case more on wholesale trading than they are on ancillary services.
Yeah, but I'm not afraid, because we are so agile. We learned that a business plan made a few years ago can't... a business plan can't be right if you freeze it, because there's so much development on the market, on the technology, also on regulation. And that is a little bit the point I see with the German developers, that they believe that business plans, once made on a shiny PowerPoint slide, prevail until operation. They don't.
They never have. I'm in the game now for more than ten years in the battery field, and no business plan made in the first place has turned out the same. The decisive point is, if you encounter a risk like FCR saturation, what is your conclusion on mitigating that risk? How agile are you to adapt your processes, your contracts, your technology, your financing, to mitigate that risk?
If you're agile, you will have a different business plan, but it will still be attractive. If you're not agile, you're lost, you're out of the game. And something that I think people get wrong all the time is this kind of concept that, oh, I've built a battery and it's going to do seven years, and that's the end of the asset. And it's a little bit set by sort of how financiers think about the duration that they're willing to put debt in.
But these assets, the lease for the site is 40 years. The connection is 40 years. And so when you get to year six or year seven, well, you're swapping your half-hour or your one-hour system for possibly a four-hour system. And it's a new asset.
It's a new investment opportunity. And so you have flexibility in the life of this project. But only in theory, if you also already have the means to adapt to it, because you need someone doing it. You need someone to change permitting, to buy, probably, more land, or do the engineering, do the repurposing and the servicing.
This is what you need. You need a whole toolset to actually extract that opportunity that is there. And I believe there's more and easier ways to have a kind of agile environment. But we especially are the deepest in delivering on everything.
And that is the licence to operate in the 2030s, I believe. And maybe actually just a, I think, fundamentally quite hard question is that in the German market, the revenues have been pretty good up until now. You've seen revenues over 200, 200,000 euros per megawatt per year, which is a good number. Um, one of the things that we've seen in other markets is that if the forecasts are too high for too long, people will bring in debt, and they'll bring in debt at kind of too high a level.
And then as the market starts to saturate, so as you move on from sort of FCR markets and you go into sort of more intraday or day-ahead, it can get quite hard for some asset owners, because they've got these large debt repayments to pay. How do you think about that? Because it's something you must be really aware of and trying to navigate with how you think about financing. Well, those projects that have had very high forecasts and have been online already, well, they have harvested their high revenues, and if they would go down, well, they will probably be paid off already.
So they've sort of done some, um, yeah, some cash sweeps and been able to pay down their debt. I think the historical assets are not endangered. We're looking to the future. I think the bank sector has really well learned.
It is still possible in Germany to do merchant financing despite curves going down. But the debt sizing is certainly different, incorporating that, and
that is one angle to tackle it: bring more equity. And, um, the other angles are protecting by tolling, by contracting. Okay. ECO STOR is really, uh, in front on getting contracting innovation to the market, together with banks and tollers that like us and help us to get it leveraged.
And that is the way to go in certain times of uncertainty. And how do you see that tolling market? Is it sort of, uh, alive and kicking, or is it sort of a few select players sort of dominating it at the moment? Well, there's a lot of innovation in the tolling market.
There are kind of interesting platforms coming out for small battery players. There's, um, others than just, um, large utilities. There's also insurance companies, or unexpected corners of the international industry, interested in providing tolls, and not only tolls. As you have recorded an episode with Nord/LB, there is certain, um, innovation degree also in the contracting market.
Also, EPEX brings out new products where you can swap to or trade against. So I think contracting and securing revenues is key. It doesn't have to be all of it, but it has to be a certain coverage of the banking exposure. Okay, that makes sense.
I'm going to move you on to Bollingstedt. Uh, could you talk us through the project? I know, I know you don't own it any longer, but could you just tell a story of how it progressed and what you learned from it? Bollingstedt was a learning vehicle for the whole industry, and we've been transparent on it ever since, because we knew it's not only an ECO STOR learning, but we want to establish industrial standards and etiquette, also how to operate assets, because we knew you can't operate it, uh, anyway, unrestricted.
And just very quickly, I will add that it was 104MW, 240 megawatt hours-ish, so just a little bit longer than two hours. And it was a battery...
It's a battery, yeah. For a certain while it was the largest operating battery in Germany. And in that time, um, we connected the batteries to the grid, where the grid operator wasn't yet sure whether this goes really well, but it was an experiment on both sides, and we connected. It operated for eight weeks, and of course it created real trouble on voltage, on congestion, on operability on the grid operator's side.
And after eight weeks, the grid operator was either asked to pull the plug or to impose hard FCA restrictions, with feed-in and charge restrictions, ramp rates, caps and ancillaries. They were not intended to, um, damage our business case, which eventually, to some extent, initially it did, but it was intended to gain back operability of the grid that had been lost. And there is an absolute, um, uh, German legislative background for a grid operator to claim back operability if an asset's behaviour endangers security of supply. There's no legal way to argue around it.
And we have taken that opportunity, because we didn't have any other chance, and said, okay, let's make an opportunity of it and try and build a certain etiquette. Now it's called the FCA, flexible connection agreement, pilot, to find a compromise on operability, but at the same time business viability and investment viability for the asset owner. Because the industry was looking very closely, and maybe this is going to be copy-pasted to other markets. There are other models on the market to mitigate, but eventually the Bollingstedt blueprint was then to be rolled out by E.ON,
the 70% DSO owner in Germany of all DSOs. And it's being adopted now in real life. It's becoming more of a standard across all DSOs. Becoming a standard.
It's a little derivative from Bollingstedt, because Bollingstedt has some specialties I really like, about a charge obligation at solar peak, which is evidently the factor to connect more solar without building out the grid. It's a funny thing to sort of say you must charge when solar's at the peak. It's like someone coming into this office and saying, Ed, you've got to eat lunch during lunchtime. And I'm
like, yeah, I do anyway. Sometimes you would want to have lunch at 1:00 because there's a meeting, and the battery is the same. There's a high price at one, but it had to be charging at 11. So it's kind of a rule that I'm very happy to sign up to.
You would do it. There's a little financial downside to it, but on the other side, it makes so much sense for the whole industry. And this aspect hasn't yet found entrance in the new FCA standard. And the new FCA standard still is not complete and has severe deficiencies on the legal side, by the way.
But anyway, FCA is a topic where Bollingstedt has been seen as the pilot, and I believe in one thing, especially in an emerging market, that you must create trust with all parties and all stakeholders, because they deserve it, to join in the game. And our important task to bring trust was via transparency. We made everything transparent, all the rules and now even the operational data. Yes, and I believe the worrying on the grid operator side has ended with the transparency we brought into the operational scheme of Bollingstedt.
And what was sort of the end position from the... as you say, like, this story is a date with two sides, and this is your side. Are you able to kind of give an impression of what the system operator ended up thinking about the site, now that you made the information from the site's operation public? There is a German saying of the rabbit being shocked in front of the poisonous snake, and the rabbit is the grid operator. The poisonous snake is the BESS industry, asking for 500 gigawatts of grid capacity.
And now imagine the grid operator SH Netz in Bollingstedt, seeing the operation of 100 megawatts, 0.1GW, with grid-endangering aspects. And then knowing that there is 5,000 times more coming in. That's impossible.
You can't scale. So the aspect of Bollingstedt being, um, in an FCA scheme with a lot of guardrails is that now it has become scalable, to deploy gigawatts and gigawatts of BESS into the German market. It's not true that gigawatts could have been scaled without FCAs. FCA is the etiquette to scale BESS in the German market.
There's no scaling without certain rules. Of course, you can discuss the rules, why rules are different at TSO level. Yes, because TSOs have more tools to control their connected assets, much more than the DSOs. You can say DSOs could do better in the digitalisation of their operation.
They're not doing really well. They need to improve. But nevertheless, even if they would do really well, you still need guardrails. Yeah.
And before scaling. And if you can get this transparency and this etiquette right, the sort of poisonous snake becomes less, uh, less concerning, and it's a happier relationship. Well, the snake is not a danger to the rabbit anymore, because it's behind the glass. Okay.
There we go. It's protected. I think we have a lovely name for the episode now. You know, the rabbit and the poisonous snake.
And people will have to listen to this point to find out what on earth we're talking about. Um, okay. One final question. Uh, what is a contrarian view you hold about the energy market in Germany?
Well, I need to highlight FCAs, because FCAs are a pain to the industry, but they are very, very important. And I believe the licence to operate in the German market comes with etiquette and FCAs, as we have covered in this episode. And there are contrarian views on how to actually rule FCAs. I think the foundation for ruling must be operability of the grid, and you can complain that the operability is limited because of the lacking digitalisation of the grid.
I don't think there is a contrarian view on this, that DSOs and TSOs could do more, but there are different opinions on what the actual solution could be. You've covered it with Green Flexibility and Kyon lately in your episodes. My view is that these concepts don't actually incorporate scalability of the solution. Therefore, I really like the E.ON
approach, despite some corners still to be shaped, and I like the TSO approach. Both are designed to be scalable and still reliable, and operate for the security of grid supply, even in a fully renewable system. And that is what ECO STOR is aiming for. We still have a lot to do, and we want to be in the game after FCAs, being agile to compensate and mitigate their financial impact, and play it until the end.
Okay. And just to give one sort of final piece that you're talking about, operability. You're saying you would like that sort of control to remain with the system operator under the FCA. That's kind of the critical twist to what we would have had on previous episodes.
It has to. There's no other choice. And you come to that point when you deploy assets in a certain amount and come to certain volumes, that I don't see other ways. Grid operators do not see other ways.
If anyone comes up with better concepts, yeah, fine, I'm open to
understand. I'm open to new concepts, and at the moment I am contrarian in saying: let the grid operator be controlling his grid, and us complying with the rules and freedom of space he gives us, because it's enough to invest. Yeah. Super.
Thank you very much for coming on. You've been a wonderful guest. And all eyes on what happens in Germany next year. Thank you.