What do French grid charges actually cost a battery?

What do French grid charges actually cost a battery?

A BESS in France pays grid charges, known as TURPE (tarif d'utilisation des réseaux publics d'électricité), almost exclusively when it imports power from the grid. A 2-hour BESS trading day-ahead pays €5k to €35k per MW per year, depending on the connection voltage. The bill has two parts:

  • A power fee on the import capacity in the battery's grid contract. It is a fixed amount per MW, paid whether the battery runs or not.
  • An energy fee on every MWh imported. The rate changes by hour and season.

Import fees rise as voltage falls, because a lower-voltage site uses more of the network. At the two lowest voltages, HTA and HTB1, the power fee alone is over 40% of the bill. That raises the question of whether a BESS should contract less import capacity than its rated power.

Key takeaways

  • French grid fees fall almost entirely on imports, and get lower as voltage rises: from €35k/MW/yr at HTA (20 kV) to only €5k at HTB3 (400 kV).
  • Location matters for network fees: a solar injection zone cuts a BESS's grid bill by 35% (HTB1) to 62% (HTB2), a demand withdrawal zone by 8% (HTB2) to 18% (HTA).
  • A 2-hour BESS at HTA or HTB1 that trades only day-ahead saves more in grid fees than it loses in revenue with an import connection smaller than its rated power.
  • Optimising dispatch for TURPE adds at most €4.6k/MW/yr because day-ahead prices already point the same way as the tariff.

Should a French BESS contract less import capacity?

TURPE's power fee pushes batteries towards longer durations. It is charged per MW of import capacity, whatever the duration. At HTA, that adds €13.6 to every MWh a 2-hour battery imports at 1.5 cycles a day, against €6.8 for a 4-hour one.

A 2-hour BESS can cut the fee by contracting less import capacity than its rated power. At HTA, cutting import capacity to 50% of rated power loses €4.5k/MW/yr of day-ahead revenue but saves €7.4k in power fees. At HTB1, the best level is 60% in our day-ahead simulation. At HTB2, where the fee is lower, every cut loses money.

Sign up to read this article for free

Unlimited access to our free articles

Monthly access to 2 Global Research articles

Benchmarks, Forecasts, Ko and more

Sign up for free

Already have an account? Log in

Modo Energy (Benchmarking) Ltd. is registered in England and Wales and is authorised and regulated by the Financial Conduct Authority (Firm number 1042606) under Article 34 of the Regulation (EU) 2016/1011/EU) – Benchmarks Regulation (UK BMR).

Copyright© 2026 Modo Energy. All rights reserved