Triads (the three half-hours of highest GB system demand between November and February separated by 10 days) set the Embedded Export Tariff (EET) that distribution-connected batteries earn for net export. Triads fell across 3 different settlement periods in the 2025/26 season, rather than the historic norm of clustering at 17:30, and the GB battery fleet captured 44% of the available credit.

Key takeaways

  • The three 2025/26 Triads landed at settlement periods 34, 35 and 37 (half-hours ending 17:00, 17:30 and 18:30). They fell on Thursday 20 November 2025, Monday 5 January 2026 and Tuesday 3 February 2026.
  • The GB battery energy storage (BESS) fleet captured 44% of available Embedded Export Tariff (EET) revenue across the three Triad half-hours in 2025/26, up from 36% in 2024/25 and below 2023/24's 57%.
  • Two-hour+ batteries captured 65% of available EET, against 29% for sub-two-hour batteries.

Where the three 2025/26 Triads landed

NESO confirmed the three 2025/26 Triads on 26 March 2026:

  • Thursday 20 November 2025, settlement period 34, net system demand 40,976 MW
  • Monday 5 January 2026, settlement period 35, net system demand 45,004 MW
  • Tuesday 3 February 2026, settlement period 37, net system demand 41,227 MW

Continue reading

GB Triads 2025/26: fleet captured 44% of available EET as the peak demand window shifted earlier

Sign up for free to read the full article

Ko - the AI analyst for energy professionals

Regulated benchmarks

Bankable forecasts

Sign up for free

Trusted by 25,000+ energy professionals • Already a subscriber? Log in

Modo Energy (Benchmarking) Ltd. is registered in England and Wales and is authorised and regulated by the Financial Conduct Authority (Firm number 1042606) under Article 34 of the Regulation (EU) 2016/1011/EU) – Benchmarks Regulation (UK BMR).

Copyright© 2026 Modo Energy. All rights reserved