11 July 2025

The Battery Buildout Report GB: Capacity Hits 5.6 GW in Q2 2025

The Battery Buildout Report GB: Capacity Hits 5.6 GW in Q2 2025

Battery buildout in Great Britain is picking up pace. Q2 2025 saw another quarter of strong growth, longer durations, and new owners entering the market, keeping GB on track for its biggest year yet. But sustaining this momentum will be key to meeting future flexibility targets.

This report breaks down the current state of battery buildout in GB, spotlighting:

  • The buildout in Q2 2025 — new capacity, sites, and market entrants
  • Shifts in average duration as two-hour+ systems dominate
  • The impact of these changes on revenue benchmarking for BESS in Great Britain
  • What the current pipeline tells us about likely growth through 2025
  • How the market is tracking against Clean Power 2030 targets

A data download of the battery energy storage project pipeline out to 2028 is available at the end of the article.

For any further information on this topic, reach out to the author - shaniyaa@modoenergy.com


Key takeaways:

    Download

    Continue reading

    The Battery Buildout Report GB: Capacity Hits 5.6 GW in Q2 2025

    Sign up for free to read the full article

    Ko - the AI analyst for energy professionals

    Regulated benchmarks

    Bankable forecasts

    Sign up for free

    Trusted by 25,000+ energy professionals • Already a subscriber? Log in

    Modo Energy (Benchmarking) Ltd. is registered in England and Wales and is authorised and regulated by the Financial Conduct Authority (Firm number 1042606) under Article 34 of the Regulation (EU) 2016/1011/EU) – Benchmarks Regulation (UK BMR).

    Copyright© 2026 Modo Energy. All rights reserved