25 September 2024

August ERCOT battery buildout report: how much capacity was added?

August ERCOT battery buildout report: how much capacity was added?

Executive Summary

  • Three new ERCOT battery storage sites became commercially operational in August 2024, adding 487 MW of rated power.
  • The Houston Load Zone saw its first 100+ MW battery, marking a shift toward a more geographically diverse buildout.
  • ERCOT remains on track to reach 14-18 GW of installed battery capacity by the end of 2025, with Houston projected to add over 4 GW.

Subscribers to Modo Energy’s Research will also find out:

  • How the South Load Zone has overtaken West Texas in battery buildout growth.
  • Why several large projects may face delays despite having interconnection agreements.
  • What trends in ERCOT’s storage deployment signal for long-term investment and market participation.

To get full access to Modo Energy’s Research, book a call with a member of the team today.

Watch the video for a flavor of the full report.

Introduction

In August, three new battery energy storage systems became commercially operational in ERCOT. Together, they bring the total installed energy capacity to around 9 GWh. Total installed rated power is now just under 6 GW.

Download

Get full access to Modo Energy Research

Already a subscriber?

Modo Energy (Benchmarking) Ltd. is registered in England and Wales and is authorised and regulated by the Financial Conduct Authority (Firm number 1042606) under Article 34 of the Regulation (EU) 2016/1011/EU) – Benchmarks Regulation (UK BMR).

Copyright© 2026 Modo Energy. All rights reserved