CAISO Cluster 16 results: 88 GW requested, 90% with energy storage
CAISO’s Cluster 16 application window this October was the first time developers could add new projects to the queue since 2023.
The preliminary results hold 226 requests, totaling 88 GW by rated power capacity, or 62.6 GW at the point of interconnection (POI). Energy storage features in 90% of requested rated power capacity across standalone and co-located projects.
Key takeaways
- Cluster 16 is storage-led. Standalone BESS (29.5 GW) and solar + storage (48.4 GW) make up most of the request list.
- Fewer, smaller applications. Cluster 16's 88 GW is 75% below Cluster 15's 347 GW in 2023, as merchant BESS revenues track 64% lower than three years ago.
- Batteries continue to aim for resource adequacy. 98% of standalone BESS capacity requests full capacity deliverability. No standalone solar does.
- New transmission is pulling capacity out of state. Nevada, Arizona and New Mexico host 13.1 GW, 20% of the cluster.
Cluster 16 received far fewer projects amidst low wholesale market revenues
Cluster 16’s total 88 GW intake by rated power is 75% lower than Cluster 15 initial intake of 347 GW.
This sharp drop in applications reflects a market where wholesale merchant revenue can no longer support investment decisions without greater certainty.
Merchant revenues for CAISO batteries averaged $6.67/kW-month in 2023. So far in 2026, they average $2.40/kW-month, 64% below 2023.
This merchant revenue environment appears to have resulted in fewer developers willing to take the risk to invest in new projects.