Last updated: 23 October 2026
Spain Methodology
Modo Energy provides benchmark data for battery energy storage systems across global energy markets. Our Indices share a common framework, and the differences between markets are documented in each methodology.
1. Introduction
This document explains how Modo Energy calculates and constructs its battery energy storage Indices in Spain. It covers four things:
- the assumptions that define a representative asset;
- the components that make up published revenues;
- the optimisation model that simulates asset dispatch; and
- the data inputs and transformations that feed the simulation.
It also sets out how judgment is applied, how late or missing data is handled, how the methodology changes, and the main limitations of the Indices.
1.1 Why Spain requires a simulated index
The ME vBESS ES Indices differ from our GB Index in one fundamental respect: they are simulated, not measured.
In Great Britain, utility-scale batteries are registered as Balancing Mechanism Units (BMUs). BMU status comes with strict data-sharing obligations. This lets us compute revenues from publicly reported physical notifications, bid-offer acceptances, ancillary contracts, and settlement metered volumes. The GB Index reflects what a representative portfolio of real assets earned.
Spain has no equivalent data regime. Battery activity in the wholesale and ancillary markets is published only at programming-unit (UP) level, not per asset. Public BESS revenue disclosures are sparse and uneven across markets. The installed fleet is also still small enough that fleet-wide measurement would not be statistically representative.
To produce a benchmark under these conditions, we simulate the dispatch of a representative battery asset against publicly available market data. We use our Global Dispatch Model, a mixed-integer linear programme (MILP) that maximises battery revenues subject to market participation rules.
1.2 What the ME vBESS ES Indices represent
The ME vBESS ES Indices (together, "the Index") represent the simulated revenue performance of grid-scale lithium-ion battery energy storage systems in Spain. The family has three variants, one per system duration (1, 2 and 4 hours), so revenues can be compared across different types of utility-scale battery systems. The Indices reflect the revenues that a representative asset could have earned, not the revenues any real battery earned.
We use a simulation because per-asset revenue data is not public in Spain. Every input is published by the market operator (OMIE) or the system operator (REE, through ESIOS), and every parameter Modo Energy sets is listed in §2.2 and §4.1.
1.3 Definitions
| Term | Meaning |
|---|---|
| Modo Energy | Modo Energy Limited, which designs, calculates and publishes the Index (the administrator). |
| ME vBESS ES Indices | The three simulated benchmarks described in this document, one per battery duration: 1H, 2H and 4H. |
| Representative asset | The hypothetical 50 MW battery in §2.2, modelled at 1, 2 and 4 hours, whose dispatch the Index simulates. |
| Market owner | The Modo Energy role responsible for the ME vBESS ES Indices. The market owner sets and maintains their parameters and makes the judgment calls in §4.3 (§4.1). |
| Custom index | An index built with the same methodology for an asset specified by a customer, for example a different size or duration. |
| Rated power | The battery's maximum charging or discharging power, in MW. |
| Duration | The number of hours the battery can run at rated power from full. |
| State of charge (SOC) | The energy stored in the battery, as a percentage of its usable capacity. |
| Cycle | One full charge and discharge. The Index counts it on the discharge side: discharging energy equal to the battery's usable capacity (§5.5). |
| Delivery day | The day on which energy is delivered, from 00:00 to 24:00 Spanish local time (CET/CEST). D-1 is the day before, D-2 two days before. |
| Assessed period | The range of delivery days over which an Index value is aggregated. |
| Settlement period | The time step of the Index: 15 minutes, or 60 minutes for markets and periods that cleared hourly (§2.6, §5.3). |
| REE | Red Eléctrica de España, the Spanish transmission system operator (TSO) and system operator. |
| CNMC | Comisión Nacional de los Mercados y la Competencia, the Spanish energy regulator. |
| Operating procedure (PO) | A Procedimiento de Operación: the rules REE applies to system operation and balancing, approved by the CNMC. |
| OMIE | The nominated electricity market operator for the Iberian (MIBEL) day-ahead and intraday markets. |
| ESIOS | REE's public information system, which publishes balancing and ancillary-service data. |
| Programming unit (UP) | The unit through which a market participant trades and is scheduled in Spain. It can group several physical assets. |
| Day-ahead (DA) | The OMIE day-ahead auction, part of the European single day-ahead coupling (SDAC). |
| Intraday continuous market (MIC) | OMIE's continuous intraday market, part of the European single intraday coupling (SIDC). |
| ICM price index | The average price of all MIC trades for a delivery period in the Spanish zone, as published by OMIE. The Index uses it for intraday and real-time energy at every date (§3.1). |
| Intraday auctions (IDA) | The three pan-European intraday auctions (IDA1, IDA2, IDA3) run within SIDC. |
| aFRR capacity (Banda Secundaria) | Automatic Frequency Restoration Reserve capacity. REE pays for holding power available, in EUR/MW/h. |
| aFRR energy (aFRRE) | The aFRR energy REE actually activates, paid per MWh. |
| mFRR | Manual Frequency Restoration Reserve (Reserva de regulación terciaria), an energy-only product in Spain, paid per activated MWh. |
| SRS reform | The reform of REE's secondary regulation service (servicio de regulación secundaria) on 20 November 2024, which made upward and downward aFRR separate products with their own prices (§2.6). |
| TTRR P2 | Phase 2 of REE's technical constraints process (restricciones técnicas, from which the abbreviation TTRR comes), run after the day-ahead market (§5.7). |
| PDBF / PDVP | The day-ahead base schedule (Programa Diario Base de Funcionamiento) and the viable schedule REE publishes after resolving technical constraints (Programa Diario Viable Provisional). |
| PICASSO / MARI | The European platforms for exchanging aFRR energy (PICASSO) and mFRR energy (MARI) between TSOs, set up under rules approved by ACER, the EU Agency for the Cooperation of Energy Regulators. |
| BSP | Balancing service provider: a participant that offers balancing energy or capacity to REE. |
| MTU | Market time unit: the period a market clears for. |
| Gate closure | The last moment at which bids can be submitted or changed for a given market and period. T-x means x minutes before the start of the delivery period. |
| POS / NEG | Upward (POS: discharge, or reduced charging) and downward (NEG: charge, or reduced discharging) directions of a balancing product. |
| Symmetric-band fallback | The rule that mirrors the published direction of aFRR and aFRRE onto the absent direction before the 20 November 2024 reform (§2.6, §8.3). |
| Market depth | The volume that competes in a market and direction: the volume offered for aFRR capacity and aFRRE, the reserve requirement for mFRR and the activated energy for TTRR P2 (§4.3, §5.6.1). |
| Price-taker threshold | The asset size, in MW, below which an asset is a price-taker and wins its full pro-rata share of the volume procured or activated. It is set as a fixed share of market depth (§5.6.1). |
| Effective power | The power a market lets the asset compete with, after the size adjustment in §5.6.1. |
| Participation ceiling | An upper bound on the share of rated power a market can absorb (§5.6.1). |
| Capture rate | The share of rated power the asset wins in a market in a given settlement period (§5.6.1). |
| Real-time step | The last optimisation step. It trades at the ICM price index and sets aFRRE and mFRR activations within two hours of delivery (§5.3.3). It does not use imbalance prices. |
| Perfect foresight | Deciding with knowledge of prices that a trader would only learn later. |
| Global Dispatch Model (GDM) | The optimisation model that simulates dispatch (§5.1). |
| Calibration factor | A single scalar that some Modo Energy indices apply to simulated revenues. It is 1.00 for Spain (§5.9). |
| TBx | Top-bottom spread: the day-ahead revenue of an x-hour battery that charges in the cheapest x hours of each day and discharges in the most expensive x hours. |
| IVPEE | The Spanish tax on the value of electricity production (Impuesto sobre el Valor de la Producción de Energía Eléctrica). |
| Material change | A change that moves any of the three Indices by more than ±2% cumulatively in a calendar quarter (§7.2). |
2. Index Construction
2.1 The ME vBESS ES Indices
Modo Energy currently produces the following Indices for Spain:
| Index | Duration | Rated power | Energy capacity |
|---|---|---|---|
| ME vBESS ES (1H) | 1-hour | 50 MW | 50 MWh |
| ME vBESS ES (2H) | 2-hour | 50 MW | 100 MWh |
| ME vBESS ES (4H) | 4-hour | 50 MW | 200 MWh |
All three Indices use the same published methodology. The only difference is the duration parameter of the representative asset. The 4-hour variant is the headline Index. Index values are available from 1 January 2022.
2.2 Representative BESS specification
The representative asset is specified as follows. Modo Energy sets these parameters, and the market owner maintains them (§4.1).
| Parameter | Value | Rationale |
|---|---|---|
| Rated power | 50 MW | Close to the average size of Spanish BESS projects in development: 53 MW across the 48 projects in Modo Energy's September 2025 buildout analysis. Rated power also sets how much of each market the asset can win (§5.6.1), so the Index benchmarks a 50 MW asset rather than a per-MW figure that scales to any size. |
| Duration variants | 1 h, 2 h, 4 h | Spans the range of commercially deployed durations in Spain. The 4-hour variant is the headline Index: the average announced duration of the Spanish pipeline was about 3.8 hours in Modo Energy's August 2026 buildout analysis. |
| Round-trip efficiency | 88% | AC-AC efficiency representative of current lithium-ion BESS, applied to charging flows. |
| Max cycles per day | 2.0 | Representative contractual warranty for Iberian BESS deployments. These target a higher cycle count than typical Northern European projects because the DA/ID spread profile is larger. |
| Max depth of discharge | 100% | Representative of current technologies. |
| Cell degradation | Disabled | The asset's duration stays constant through the Index, which keeps years comparable. Degradation can be enabled in custom indices. |
| Grid import/export limit | Equal to rated power (50 MW) | No grid connection restrictions assumed. This can be customised in custom indices. |
| Grid fees and IVPEE | Zero | The IVPEE generation tax (7% of export revenue) is being phased out under Real Decreto-ley 18/2026 of 29 June 2026: the rate falls to 3.5% in 2027 and 0% from 2028. It is supported as an optional parameter. We set it to zero in the published Index so Spain stays comparable with other European markets. It can be enabled in custom indices. |
2.3 Index calculation methodology
We calculate each Index in four steps:
- Run the Global Dispatch Model over the assessed period, using the representative asset in §2.2 with that Index's duration and the input data in §4.2.
- Compute the simulated revenue of the representative asset in EUR, for each modelled market and direction.
- Sum revenues per settlement period and divide by the rated power (50 MW). This gives an Index value in EUR/MW per settlement period.
- Aggregate these values into monthly, quarterly and annual figures, as described in §2.4.
The calculation is rule-based. Where judgment is needed, it is applied as described in §4.3. No post-hoc calibration factor is applied (see §5.9).
2.4 Index value representation
All Index values are reported as revenue per unit of rated power. Revenue is market revenue net of the cost of charging energy, before operating costs, fees and taxes (§3.2). Index values can be represented in two units:
- EUR/MW/year (annualised): total Index revenue for the assessed period, divided by the number of days in the period, multiplied by 365.
- EUR/MW/hour: total Index revenue for the assessed period, divided by the number of hours in the period.
Index values do not scale linearly with rated power. Spanish ancillary and balancing markets have finite depth. A larger battery has to bid deeper into the merit order to clear the same share of its book, so per-MW revenue falls as size rises. In the model this applies to the ancillary and balancing markets (§5.6.1). Day-ahead revenue per MW does not change with size, and intraday trading is capped at traded volume (§5.3.2). The ME vBESS ES Indices report a 50 MW asset. §5.6.1 sets out how size is priced, and users who need a different size can build one as a custom index.
2.5 Publication cadence and revisions
The ME vBESS ES Indices update daily. We ingest source data from all markets in §4.2 every day and publish Index values for delivery day D-2, normally every calendar day (§2.7). The two-day lag gives settlement, late submissions, and backfills on aFRRE, mFRR, and TTRR P2 activated-energy series time to complete before we compute the Index for that day.
Previously published Index values may be revised in three cases: when ESIOS or OMIE correct or complete values for periods already published; when new source data materially improves a historical value; or when a methodology change under §7 applies retrospectively.
2.6 Market evolution reflected in the Index
The Index reflects each market structure only for the periods in which its native mechanism and data were in force. The key Iberian milestones are:
| Milestone | Effective date | Impact on the Index |
|---|---|---|
| The three SIDC pan-European intraday auctions (IDA1/IDA2/IDA3) replaced OMIE's six regional intraday sessions. The continuous intraday market (MIC) has run alongside them since June 2018. | 13 June 2024 | No change to the Index. The intraday step trades the MIC at the ICM price index at every date, not the sessions or the auctions. |
| aFRR capacity and aFRRE activated-energy markets moved from a single band at one price to separate POS and NEG products, each with its own price, under the SRS reform. | 20 November 2024 | Before this date, ESIOS published these series for one direction only. The model mirrors the published side onto the absent side (the symmetric-band fallback), so revenues stay comparable across the reform boundary. From this date onward, POS and NEG are independent products in the model. |
| Spain's mFRR (terciaria) activated-energy market connected to the European MARI platform, with clearing per 15-minute MTU and a BSP gate closure of T-25 minutes. | 10 December 2024 | mFRR activated energy is modelled across the whole history. From this date its price signal reflects MARI clearing. |
| OMIE intraday auctions and the MIC moved to 15-minute products, traded from 18 March 2025 for delivery from 19 March. OMIE publishes the ICM price index for each 15-minute delivery period. | 18 March 2025 | The intraday and real-time optimisation steps switch from 60-minute to 15-minute granularity, and so does the model grid (§5.3). The ICM price index moves from hourly to 15-minute periods. |
| Spain connected to the European PICASSO platform for aFRR energy activation (4-second clearing, 5-minute full activation time). | 17 June 2025 | aFRRE activation prices reflect PICASSO cross-border clearing from this date, aggregated to 15-minute settlement periods. |
| OMIE day-ahead auction moved from a 60-minute to a 15-minute market time unit, in line with the European SDAC migration. TTRR P2 moved to 15-minute periods on the same date. | 1 October 2025 | Day-ahead revenue switches from hourly to 15-minute clearing prices, and day-ahead positions are set every 15 minutes (§5.3.1). The model keeps TTRR P2 positions hourly (§5.7). |
| EU rules moved cross-zonal intraday gate closure to 30 minutes before delivery. The CNMC granted Spain a temporary exception, so the MIC still closes 60 minutes before delivery. | 1 January 2026 | No change to the Index. |
Because of these changes, Index values before and after each milestone are not fully comparable (§9).
2.7 Minimum data
The Index for a delivery day needs the price, activation and traded-volume inputs in §4.2 for that day. The offered volumes and the mFRR reserve requirement are used only for the static market-depth measurement in §4.3, so they are not needed for a single day. If a required input is missing or incomplete when the day is computed, the day is run again once the data arrives (§8.3). Within a day, the fallbacks in §8.3 fill gaps in individual periods.
3. Revenue Components
3.1 Revenue components included in the Indices
The ME vBESS ES Indices capture the primary revenue opportunities available to a representative BESS in Spain's wholesale and ancillary markets. The table below shows each component, the market it is modelled from, and the price signal used.
| Revenue stream | Source | Direction | Price signal |
|---|---|---|---|
| Day-ahead (DA) | OMIE MIBEL day-ahead auction | Charge and discharge | Hourly clearing price (EUR/MWh) until 30 September 2025, 15-minute clearing price from 1 October 2025 |
| Intraday (ID) | OMIE intraday continuous market (MIC), ICM price index | Charge and discharge | ICM price index (EUR/MWh): hourly until 17 March 2025, 15-minute from 18 March 2025 |
| Real-time (RT) | OMIE intraday continuous market (MIC), ICM price index | Charge and discharge | ICM price index (EUR/MWh) |
| aFRR capacity (Banda Secundaria) | ESIOS Banda de regulación secundaria, capacity contract | POS and NEG procured separately from 20 November 2024; a single symmetric band before that | Cleared capacity price (EUR/MW/h) |
| aFRRE activated energy | ESIOS aFRR activated energy | POS and NEG | 15-minute marginal activation price (EUR/MWh) |
| mFRR activated energy (Reserva de regulación terciaria) | ESIOS mFRR activated energy | POS and NEG | 15-minute marginal activation price (EUR/MWh) |
| TTRR P2 activated energy (technical constraints, phase 2) | ESIOS TTRR daily P2 activated energy | POS and NEG | Activation price published by ESIOS (EUR/MWh), with positions held for the whole hour |
3.2 Excluded revenues and costs
The ME vBESS ES Indices exclude revenues and costs from the following sources:
- Primary reserve (regulación primaria): in Spain, primary frequency response is a mandatory, unpaid obligation for generators above a size threshold. It is not a traded product, so there is no revenue stream to model.
- Imbalance settlement: we assume positions are fully closed out in the real-time step, so no residual imbalance exposure is modelled.
- Capacity market payments: not modelled. Orden TED/966/2026 of 15 September 2026 created a capacity market for mainland Spain, but no auction has cleared, so there is no capacity revenue to include.
- Curtailment compensation: site-specific, so not modelled.
- Network access charges and taxes: site-specific, or set to zero for comparability (§2.2). They default to zero in the representative asset.
- Bilateral contracts (PPAs, tolls, floors): not modelled. Their terms are private and asset-specific.
- Battery operator fees, warranty costs, and O&M: the Index reports market revenue net of charging costs, not net of operating costs.
4. Data Inputs and Use of Discretion
4.1 Data visibility and parameters
The Index is built exclusively from publicly available market data, with the exception of the representative asset in §2.2 and the parameters below. Modo Energy sets these parameters rather than observing them. The table lists each parameter with its value, the reason for it and the section that defines it. Modo Energy's market owner for Spain sets and maintains both the representative asset and these parameters (§4.3).
| Parameter | Value | Rationale | Defined in |
|---|---|---|---|
| State of charge at midnight | 0% | Lets each day be solved on its own, with no energy carried from one day to the next. | §5.5 |
| Daily cycling limit | 2.0 cycles, counting wholesale discharge and ancillary activation | Warranties are typically written on total throughput, not on the market the energy was sold into. | §2.2, §5.5 |
| SOC delivery horizons | 15 minutes for aFRR, aFRRE and mFRR; 60 minutes for TTRR P2 | Energy reservoir requirements in REE's prequalification conditions. | §5.4 |
| Rolling window | 2 hours, in the intraday and real-time steps | Limits foresight to a short horizon close to delivery, as a trader would have near gate closure. | §5.3 |
| Intraday liquidity cap | Volume traded in the MIC in each period and direction, and never more than twice rated power | The asset cannot trade more than the market traded. Twice rated power is the largest change in position a battery can make, from full charging to full discharging power. | §5.3.2 |
| Market depth | Per market and direction (table in §4.3). Taken in July 2026 and applied across the assessed period | Measures all competing providers, not batteries alone. | §4.3, §5.6.1 |
| Price-taker threshold | 0.2% of market depth for aFRRE, mFRR and TTRR P2; 1% for aFRR capacity | Set from backtest sensitivity runs over January 2025 to June 2026 at 5, 50 and 500 MW. | §4.3, §5.6.1 |
| Participation ceiling | 30% of rated power for aFRR capacity and TTRR P2 upward; none elsewhere | aFRR capacity: no asset sustains full rated power in every period, and 30% sits below the roughly half of the offered band that the auction allocates. TTRR P2 upward: called in too few periods to drive dispatch. | §5.6.1 |
| Symmetric-band fallback | Mirrors the published aFRR and aFRRE direction onto the absent one before 20 November 2024 | Keeps revenues comparable across the SRS reform. | §2.6, §8.3 |
| Revenue calibration factor | 1.00 (none applied) | Public per-asset revenue in Spain is too sparse to anchor one. | §5.9 |
4.2 Data inputs and sources
The inputs and their providers are listed below. The fallbacks applied to them are set out in §8.3.
| Input | Source |
|---|---|
| Day-ahead price (DA) | OMIE clearing price, as republished by ESIOS |
| ICM price index: average price of MIC trades, Spanish zone | OMIE Intraday Continuous Market |
| Intraday continuous (MIC) traded volume | OMIE Intraday Continuous Market |
| aFRR capacity price (POS, NEG) | ESIOS |
| aFRR capacity allocated (POS, NEG) | ESIOS |
| aFRR capacity offered (POS, NEG), for market depth | ESIOS |
| aFRRE activation price (POS, NEG) | ESIOS |
| aFRRE activation volume (POS, NEG) | ESIOS |
| aFRRE energy offered (POS, NEG), for market depth | ESIOS |
| mFRR activation price (POS, NEG) | ESIOS |
| mFRR activation volume (POS, NEG) | ESIOS |
| mFRR reserve requirement (POS, NEG), for market depth | ESIOS |
| TTRR P2 activation price (POS, NEG) | ESIOS |
| TTRR P2 activation volume (POS, NEG), also for market depth | ESIOS |
Each input has a single source, and no second source is used as a backup. We ingest all inputs into our data lake daily.
4.3 Use of discretion and consistent judgment
The Index is rule-based. The parameters in §2.2 and §4.1 apply in the same way to every day and every duration, and no value is set by hand for a single day. Judgment is used only when a source or parameter is chosen or changed, and the market owner makes that call. We select sources based on reliability, relevance to BESS operations, and the activity, depth, and transparency of the underlying market.
Every parameter sits in the code of the Global Dispatch Model. A change is reviewed by a second person before release, is tested by the automated regression tests in §8.1, and follows the change process in §7.2.
Three inputs to the size-aware participation model in §5.6.1 are set by Modo Energy rather than read directly from a published series:
- Market depth. For each market and direction, we measure the volume that competes for what the system procures or activates, from the ESIOS sources in §4.2. For aFRR capacity and aFRRE this is the volume offered. ESIOS publishes no offered volume for mFRR or TTRR P2, so mFRR uses REE's reserve requirement and TTRR P2 its activated energy. Batteries are not the only bidder: hydro, thermal plant and demand-side flexibility compete for the same volumes, and the measurement covers all of them.
- Price-taker threshold. Below a fixed share of market depth, an asset takes its full pro-rata share of what the system procures or activates. We set that share from backtest sensitivity runs over January 2025 to June 2026 at 5, 50 and 500 MW. The aFRR capacity auction carries a higher threshold than the balancing energy markets: its prices are flat within a delivery period, so there is no price tail for a small asset to select into.
- Participation ceiling. aFRR capacity and TTRR P2 upward carry a ceiling of 30% of rated power. §5.6.1 explains why.
The values used are:
| Market | Depth, POS / NEG (MW) | Price-taker threshold, POS / NEG (MW) | Measured from | Measurement |
|---|---|---|---|---|
| aFRR capacity | 2,180 / 2,430 | 21.8 / 24.3 | Capacity offered | Mean, January 2025 to April 2026 |
| aFRRE | 1,250 / 1,250 | 2.5 / 2.5 | Energy offered | Mean, January 2025 to April 2026 |
| mFRR | 1,650 / 825 | 3.3 / 1.65 | Reserve requirement | Mean, January to June 2026 |
| TTRR P2 | 300 / 800 | 0.6 / 1.6 | Activated energy | Mean activated volume per period, taken in July 2026 |
Depths are rounded. The capture formula depends on rated power and market depth only, not on duration, so the same parameters apply to all three Indices. Market depths are static measurements taken in July 2026 and applied across the assessed period. ESIOS publishes the aFRR capacity and aFRRE offer files with a lag of around 90 days, so their measurement ends in April 2026.
5. Modelling Methodology
5.1 Overview of the Global Dispatch Model
We produce the Index by simulating the dispatch of the representative asset in §2.2 against historical market prices, using our Global Dispatch Model (GDM). This is the same proprietary optimisation framework behind our Indices in other regions and our forecasts. For each day in the assessed period, the GDM works out how the representative asset would have scheduled its power across the markets in §3.1 to maximise revenue, given the physical limits of the battery and the rules of each market.
5.2 What the model is solving for
The GDM answers one practical question: given the prices observed on a given day, and the physical and regulatory limits of the asset, what is the highest revenue the asset could have earned with the foresight set out in §5.3?
To answer it, the model allocates the battery's power and stored energy across three families of market opportunities:
- Energy markets: the day-ahead market and OMIE's continuous intraday market.
- Ancillary capacity markets: aFRR (Banda Secundaria), where the battery is paid to hold capacity available for REE.
- Ancillary activated-energy markets: aFRRE, mFRR, and TTRR P2, where the battery is paid in EUR/MWh for the energy it actually delivers when called.
Revenue is the sum of these streams, net of the charging energy cost. The model also applies internal consistency rules that stop it from scheduling trades that look profitable on paper but that a physical battery could not execute (§5.4).
5.3 Three-step optimisation sequence
A real BESS trader in Spain does not make all decisions at the same moment. Each market gate closes before the next, and traders commit at each gate using only the information available at that point. The sequence of the Spanish power market is:
| Market | Gate closes | Result / schedule published |
|---|---|---|
| Day-ahead (SDAC) | D-1 12:00 | D-1 ~12:57 |
| Technical constraints | D-1 ~13:30 (15 minutes after PDBF publication at ~13:15) | D-1 by 14:45 (PDVP) |
| aFRR capacity (Banda Secundaria) | D-1 16:00 (or PDVP + 75 minutes, whichever is later) | D-1 by 16:30 |
| Intraday continuous (MIC) | T-60 minutes | Continuous; no single publication event |
| mFRR energy (MARI) | T-25 minutes before each 15-minute MTU | Clears every 15 minutes; full activation time 12.5 minutes |
| aFRRE energy (PICASSO) | T-25 minutes before each 15-minute MTU | Clears every 4 seconds; full activation time 5 minutes |
Times are Spanish local time (CET/CEST). Three timing features shape the optimisation sequence:
- The MIC has no single gate close. It is a continuous market. Positions roll until the T-60 hard stop for each delivery period. Spain keeps T-60 under a temporary CNMC exception to the EU cross-zonal gate closure of T-30.
- mFRR and aFRRE share the same BSP gate closure time (T-25 minutes). This is set by the ACER-approved Implementation Frameworks and transposed into PO 7.2 and PO 7.3. They differ in clearing speed: aFRRE clears every 4 seconds, mFRR every 15 minutes.
- Most markets now clear at 15 minutes. Intraday auctions and the MIC moved on 18 March 2025, and day-ahead and TTRR P2 on 1 October 2025 (96 periods per day, up from 24). The model keeps TTRR P2 at 60 minutes (§5.7).
The model reflects this sequence by solving the dispatch problem in three sequential steps:
- Day-ahead step: sets aFRR capacity commitments, day-ahead energy positions, and TTRR P2 commitments, co-optimised at this step. Activated volumes are published only after delivery, so the model uses the realised activations instead of a forecast.
- Intraday step: rebalances day-ahead positions in the MIC at the ICM price index.
- Real-time step: sets aFRRE and mFRR activated-energy positions. The MIC is also traded in this step, at the ICM price index.
Each step takes the positions committed in earlier steps as fixed. Once a decision is locked in, the model cannot unwind it. This sequencing keeps the simulation closer to how a real trader operates than a single all-markets optimisation would.
5.3.1 Day-ahead step
- Granularity: 60 minutes before 18 March 2025. From that date the step runs on the 15-minute model grid (§5.3): aFRR capacity is set every 15 minutes, and day-ahead energy is held constant across each hour until 30 September 2025 and set every 15 minutes from 1 October 2025, reflecting the OMIE / SDAC move to a 15-minute day-ahead auction. TTRR P2 positions are held for a whole hour throughout (§5.7).
- Foresight: perfect foresight of day-ahead energy prices, aFRR capacity prices and TTRR P2 activation prices over the full day.
- Markets optimised: day-ahead energy, aFRR capacity, TTRR P2 activated energy.
5.3.2 Intraday step
- Granularity: 60 minutes before 18 March 2025; 15 minutes from 18 March 2025 onward.
- Rolling horizon: 2-hour windows, advanced sequentially.
- Foresight: perfect foresight of the intraday prices in §3.1 over each 2-hour rolling window.
- Markets optimised: the MIC at the ICM price index.
- Commitments carried in: day-ahead energy positions, aFRR capacity and TTRR P2 positions from Step 1 are fixed.
- Liquidity cap: in each period and each direction, combined intraday and real-time dispatch is capped at the volume traded in the MIC in that period, and never above twice rated power. The MIC does not run through the capture formula in §5.6.1, because continuous trading executes against a live order book rather than competing for acceptance in an auction.
5.3.3 Real-time step
- Granularity: 60 minutes before 18 March 2025; 15 minutes from 18 March 2025 onward.
- Rolling horizon: 2-hour windows, advanced sequentially.
- Foresight: perfect foresight of the ICM price index and of aFRRE and mFRR activation prices over each 2-hour rolling window.
- Markets optimised: the MIC at the ICM price index (real-time energy), aFRRE activated energy, mFRR activated energy.
- Commitments carried in: all prior steps' positions are fixed.
5.4 Market stacking and physical limits
Spain's market design lets a battery hold simultaneous positions across day-ahead energy, intraday continuous energy, real-time energy, aFRR capacity, aFRRE energy, mFRR energy, and TTRR P2 energy. Two things limit it: the physics of the battery and its grid connection, and the depth of each market. The model enforces stacking through four families of constraints:
- Sufficient state of charge for ancillary delivery. The battery's state of charge at each timestep must be enough to deliver every discharging-direction ancillary product it holds at that moment. Each product has its own delivery horizon: 15 minutes for aFRR, aFRRE and mFRR, and 60 minutes for TTRR P2. These horizons come from the energy reservoir requirements in the REE prequalification conditions.
- No double-counting between aFRR and aFRRE. aFRR (capacity reservation) and aFRRE (energy activation) are distinct products. The model applies a pair of parallel constraints so that each physical limit (grid, battery, SOC) is checked once including aFRR and once including aFRRE, but never both in the same inequality. Reserved aFRR capacity must bid into aFRRE but is not necessarily activated, and it cannot bid into other energy markets at the same time.
- One direction at a time in activation markets. For the three energy-activation markets (aFRRE, mFRR, TTRR P2), the model allows only one direction (POS or NEG) per timestep per market, enforced through a binary variable. This stops the model from earning revenue on both sides of an activation product in the same settlement period, which is physically impossible.
- Market depth. Each ancillary and balancing market absorbs only a share of what the asset offers into it, and that share falls with asset size. §5.6.1 sets out how it is measured and applied, and how the intraday continuous market is treated instead.
5.5 Battery physical model
The representative asset is modelled as a single lumped battery governed by four technical characteristics:
- Round-trip efficiency of 88%. Efficiency losses apply to the charging flow: 1 MWh drawn from the grid stores 0.88 MWh of usable energy.
- Continuous state of charge. Stored energy in each timestep equals the previous level, plus charging (net of efficiency), minus discharging. The SOC adjustment uses the net energy flow across energy markets within each timestep. Offsetting trades that net out within a settlement period therefore incur no round-trip efficiency penalty.
- State of charge boundaries. To allow day-by-day solving, SOC is assumed to be 0% at midnight each day. During the day, SOC can vary freely between 0 and 100%, subject to the cycling cap below.
- Cycling limit per day. Total discharge throughput per day is capped at the daily cycling limit (2.0 cycles) times the battery's usable capacity. Both wholesale discharge and ancillary activation count towards the cap. Warranties are typically written on total throughput, not on the market the energy was sold into.
Cell-level degradation is intentionally disabled in the published Index (§2.2). This keeps the asset's duration constant across the full history, so years remain comparable.
5.6 Ancillary services: capacity vs activated energy
Spain's balancing stack separates two things: reserving capacity (Banda Secundaria capacity payments) and delivering energy when called (aFRRE, mFRR, and TTRR P2 activation payments). The two product families bid into different gates, and the model treats them differently:
- aFRR capacity (Banda Secundaria). REE pays the battery for holding capacity available. The bid is set in the day-ahead step. Revenue accrues at the cleared capacity price, in EUR/MW/h, on the capacity the auction accepts. That is a share of the asset's bid, set by the capture rate in §5.6.1. Capacity held reduces the power and SOC available for energy markets. Holding capacity is independent of activation: it does not drain SOC or count towards cycling on its own, so the capacity payment is the only revenue from aFRR itself.
- aFRR capacity and aFRR energy. Since the 20 November 2024 SRS reform, aFRR energy bids are formally decoupled from the capacity allocation. A provider could, in principle, price its energy bid out of activation. In practice, REE expects allocated capacity to stay available. The model therefore assumes that capacity allocated in the day-ahead step remains fully available to the aFRRE energy market.
- Activated-energy markets (aFRRE, mFRR, TTRR P2). The battery is paid in EUR/MWh on the energy it actually delivers when called. Revenue is recognised on the activated MWh, not the contracted MW. The energy flow moves SOC and counts towards the daily cycling limit.
5.6.1 Market depth and capture rate
Spanish ancillary and balancing markets are shallow next to the wholesale market. A battery that could sell its full rated power into every one of them would win a share of national volumes that no real asset achieves. Size is the binding constraint. A small battery clears its volume without moving the bid ladder; a large one has to bid deeper into the merit order and earns increasingly average prices.
The model prices this with a single formula, applied to aFRR capacity, aFRRE, mFRR and TTRR P2. Three quantities define it:
- Market depth: the volume that competes in that market and direction, measured from published data (§4.3).
- Price-taker threshold: a fixed share of market depth, below which an asset is a price-taker and wins its full pro-rata share of the volume procured or activated.
- Participation ceiling: an upper bound on the share of rated power a market can absorb, applied after the formula.
Effective power is the power the market lets the asset compete with:
Below the threshold the asset is a price-taker, and effective power equals rated power. Above it, effective power grows with the logarithm of size: each ten-fold increase in rated power adds roughly the same number of megawatts. The curve is continuous through the threshold.
The cap on what the asset can win in a given settlement period follows from effective power, the volume the system actually procured or activated in that period, and market depth:
P rated power · D market depth · T price-taker threshold, in MW (the threshold share times D) · Vt volume procured or activated in period t · c participation ceiling
Dividing this cap by rated power gives the capture rate: the share of rated power the asset wins. The capture rate is not itself logarithmic. Effective power is, and the rate falls out of the division. The shape of the curve depends only on the ratio of rated power to market depth, so one curve prices a 5 MW and a 500 MW asset, with only the threshold share and ceiling in §4.1 set per market. The level in each period also scales with the volume procured or activated (Vt/D). It does not depend on duration, so the same cap applies to all three Indices. Because depth differs by market and direction, the size at which the constraint starts to bite differs too.
The intraday continuous market is excluded. In the four markets above, offers compete for acceptance in a merit order, so a larger asset has to bid deeper to be accepted, and the logarithmic term approximates that. The MIC is pay-as-bid and continuous: trades execute against resting orders at their own prices, with no merit order to bid down and no acceptance to compete for. Size still constrains it, but through the liquidity available in the order book rather than through cannibalisation. The model caps MIC dispatch at the volume actually traded in each period instead (§5.3.2).
The participation ceiling
aFRR capacity is deep enough that the logarithmic term returns close to full rated power for small and mid-scale assets. That result is unreachable in practice. Across the market, the auction allocates roughly half of the band offered to it: 55% upward and 49% downward between January 2025 and April 2026. No asset sustains its full rated power in aFRR capacity in every period of the year. Capacity held for aFRR is also not available for intraday trading.
Modo Energy therefore applies a ceiling of 30% of rated power to aFRR capacity and to TTRR P2 upward, taken after the logarithmic term. For aFRR capacity, 30% sits below the roughly half of the offered band that the auction allocates. The ceiling and the curve do opposite things to the spread between asset sizes: the curve is size-dependent and widens it; the ceiling is size-blind and flattens it across the small and mid-scale range. They are separate controls, and we set them separately.
The ceiling can bind only while effective power stays above 30% of rated power, and then only in periods where enough of the band is procured. For aFRR capacity, effective power stays above 30% up to about 250 MW upward and 280 MW downward. Above that the curve takes over: effective power falls to 18–20% of rated power at 500 MW and 10.5–11.5% at 1,000 MW, before the scaling by volume procured in each period. aFRRE, mFRR and TTRR P2 downward carry no ceiling, so their capped and uncapped curves are identical.
The ceiling is a modelling assumption, not a limit on what an asset may offer. Custom indices can restrict participation further, and the two apply on top of each other.
5.7 Technical constraints (TTRR P2)
TTRR P2 is phase 2 of the technical constraints process that REE runs immediately after the day-ahead market clears. REE checks the day-ahead schedule (PDBF) for network constraints and publishes a viable schedule (PDVP) by D-1 14:45. The process runs in two phases:
- Phase 1 is locational. REE dispatches specific assets to resolve network constraints in the PDBF. Upward dispatch is paid as bid. Downward curtailment is not paid.
- Phase 2 is open country-wide. Any unit in Spain can participate. REE rebalances the system as a whole, keeping Phase 1 commitments fixed.
Phase 1 mostly dispatches thermal generation upward to resolve constraints. Phase 2 then nets that energy off through downward activations. The result: Phase 2 is structurally a downward market. Downward activations exceeded upward activations by more than an order of magnitude in 2025. This creates a systematic interaction between day-ahead positions and Phase 2 activations, which is why the model co-optimises day-ahead energy and TTRR P2 in the same step (§5.3.1). In dispatch, the model uses TTRR P2 downward activations in two distinct ways:
- Same-period netting. Energy sold in the day-ahead market is bought back in TTRR P2 within the same settlement period. The position nets out financially without moving the battery's state of charge. Under the net-flow SOC rule in §5.5, it incurs no round-trip efficiency penalty.
- Charging source. The battery charges at the TTRR P2 downward activation price and discharges the stored energy later into the day-ahead, intraday, or balancing markets. In these periods, TTRR P2 is simply an alternative to charging at the day-ahead or intraday price.
Unlike the frequency-control markets, TTRR P2 activations are persistently asymmetric, especially in periods of high renewable curtailment. The Index reflects these properties as follows:
- Granularity: the model holds TTRR P2 positions for a whole hour throughout. TTRR P2 has cleared every 15 minutes since 1 October 2025, so from that date this is a simplification (§9).
- Modelled from realised data: the model uses realised ESIOS activation data rather than a forward signal, and applies the capture rate in §5.6.1 to national volumes. Phase 2 is open to any unit in Spain, so national volumes are the base a real asset competes for.
- Participation ceiling: upward activations carry the 30% ceiling in §5.6.1. Phase 2 upward is called in a small fraction of periods, and a market called that rarely should not drive dispatch. Downward activations carry no ceiling.
- Asymmetric coverage: where ESIOS publishes only one direction (commonly NEG), the symmetric-band fallback in §8.3 does not apply. TTRR P2 is intrinsically asymmetric. The gap is real, not a measurement artefact.
5.8 mFRR (Reserva de regulación terciaria)
The mFRR market compensates manual frequency restoration as an energy-only product. REE calls mFRR-qualified plants per event and pays the cleared marginal price on activated MWh. Spain has no separately paid mFRR capacity product. The market connected to the European MARI platform on 10 December 2024, with clearing per 15-minute MTU and a BSP gate closure of T-25 minutes.
The mFRR price signal is asymmetric and tail-heavy. Upward activation prices average well above day-ahead levels and spike hard in scarcity events. Downward activation prices average close to zero. Capturing this asymmetric signal is a key reason mFRR is included in the stack. The model treats mFRR as follows:
- Granularity: 15 minutes from 18 March 2025. Before that date the model reads mFRR at the first quarter-hour of each hour (§5.3).
- Modelled from realised data: ESIOS publishes mFRR activations only after the fact, so the model uses realised ESIOS activation data.
- Size-aware participation: activated volume is capped by the capture rate in §5.6.1. mFRR carries no participation ceiling.
- Energy-activation only: revenue is recognised on activated MWh. There is no capacity payment.
5.9 Revenue calibration
In other Modo Energy indices (for example ME vBESS DE), we apply a flat calibration factor to all simulated per-timestep revenues. It bridges the gap between perfect-foresight modelled revenues and what a real fleet can earn, covering residual foresight, availability, and execution gaps.
For the ME vBESS ES Indices, no post-hoc calibration factor is applied (calibration factor = 1.00). Public per-asset BESS revenue disclosure in Spain is too sparse to anchor a Spain-specific factor, and Modo Energy has chosen not to transfer a factor observed in another market. The Index may therefore overstate what an operating battery earns (§9).
The size-aware participation parameters in §5.6.1 are listed in §4.1. Market depths are measured from ESIOS data, and Modo Energy sets the price-taker threshold and the participation ceilings (§4.3). They act inside the optimisation, on how much volume the asset can win, rather than as a scalar applied to the revenue it earns.
6. Transparency
We publish detailed explanations of calculation methodologies, revenue components, and benchmark updates, so stakeholders can understand how the benchmark works. Transparency measures include:
- Publication of methodology documents outlining calculation processes and revenue components.
- Revisions of historical values, as described in §2.5.
- Advance notice of material methodology changes in line with §7.2.
- A contact point for questions about the methodology: team@modoenergy.com.
7. Methodology changes
7.1 Review and update process
The methodology is reviewed when market rules, market conditions or data availability change, and when inputs or results look out of line. Examples include the OMIE move to 15-minute day-ahead auctions, the SRS reform of aFRR procurement, and ESIOS publication of new activated-energy series. Any change that follows goes through §7.2.
Direct back-testing against observed transactions is not possible, because per-asset revenue is not publicly disclosed in Spain. Instead, we cross-check the day-ahead revenue of the 4H Index against Modo Energy's hourly TB4 spread for Spain. The Index earned about EUR 90k/MW/year in the day-ahead market in 2024 and EUR 129k/MW/year in 2025, against a TB4 spread of about EUR 88k/MW/year and EUR 121k/MW/year. The Index can sit above TB4 because it may cycle twice a day, trades 15-minute prices from 1 October 2025, and can sell day-ahead energy that it buys back in TTRR P2 (§5.7). Both are perfect-foresight measures, so this checks the day-ahead step, not realisable revenue. We also compare the revenue stack composition with Modo Energy's published Iberian BESS market analysis.
7.2 Material and non-material changes
A change is material where it moves any of the three Indices by more than ±2% cumulatively in a calendar quarter. Material changes are announced with not less than 30 days' written notice before they take effect, together with an impact analysis. We welcome feedback on proposed material changes during the notice period at team@modoenergy.com.
Other changes are non-material. They include corrections and clarifications that do not alter the substance of the methodology. They may be made without prior notice and are disclosed as soon as practicable.
Emergency changes needed to protect the integrity of the benchmark or to comply with law may be made without prior notice, with notice given as promptly as circumstances permit.
All changes are recorded, with their effective date, in the change log (Appendix I).
7.3 Recalculation of published values
When a methodology change applies with retrospective effect, Index values may be recalculated across the published history, as they were for version 0.4 (Appendix I). Only the current version of results is available at any time.
8. Consistency and continuity
8.1 Quality assurance
Modo Energy uses these checks:
- Automated validation checks to identify discrepancies in input data.
- Automated regression tests on every change to the Global Dispatch Model.
8.2 Data integrity
We maintain data integrity through:
- Access controls on the data lake and on the model code.
- Traceability from each raw source (ESIOS, OMIE) into the model feed.
8.3 Late, missing or distorted data
The two-day lag in §2.5 normally gives every input in §4.2 time to arrive. If an input for a delivery day is still missing or incomplete when the Index is computed, the day is run again once the data is available, and its value is updated (§2.5, §2.7).
Inputs are used as published, including extreme prices and periods of system stress such as the Iberian blackout of 28 April 2025. Index values are not adjusted by hand for market stress. The only adjustments are these:
- Price and allocation gaps. Where a price or the aFRR capacity allocation is missing for a period, the model uses the last published value.
- Intraday volume gaps. OMIE omits periods with no MIC trades. A period with no published traded volume therefore gets a liquidity cap of zero, and the asset cannot trade intraday or real-time energy in it (§5.3.2).
- Symmetric-band fallback. Before 20 November 2024, ESIOS published aFRR capacity and aFRRE in one direction only. The model mirrors the published direction onto the absent one (§2.6).
- No activation without data. Where ESIOS publishes no aFRRE, mFRR or TTRR P2 activation for a period and direction, the model treats it as no activation. For TTRR P2, where ESIOS often publishes only one direction, the published side is not mirrored, because the market is intrinsically asymmetric (§5.7).
If a source corrects data for a period already published, the Index for that period may be recalculated (§2.5).
8.4 Traceability and verification
Every benchmark calculation is traceable:
- We record the model version that produces the published Index, and keep the outputs of each run.
- Reproducibility: current published Index values can be recomputed from the current input data and that model version.
- Material methodology changes are disclosed publicly (§7.2).
9. Limitations
The Index is a simulation. These are its main limits:
- Simulated, not measured. It shows what a representative asset could have earned, not what any real battery earned. Per-asset revenue is not public in Spain, so the Index cannot be back-tested against real results (§7.1).
- Foresight. The model knows day-ahead, aFRR capacity and TTRR P2 prices for the full day when it commits day-ahead positions, and intraday, aFRRE and mFRR prices two hours ahead (§5.3). No calibration factor corrects for this (§5.9), so the Index may overstate what an operating battery earns.
- Shallow, concentrated markets. Spanish ancillary and balancing markets are shallow, and competing offers come from a limited number of providers, mainly hydro and thermal plant. The size model in §5.6.1 prices this with static market depths, taken in July 2026 (§4.3) and applied to the whole history. It cannot capture how depth changed over time or how a real asset's bid prices affect its acceptance. TTRR P2 activations are seasonal and have grown since 2023, so a single depth figure fits that market least well.
- Price-taking in energy markets. The asset's day-ahead and intraday trades are assumed not to move clearing prices or the ICM price index.
- Index prices. Intraday and real-time revenues are valued at the ICM price index, an average of continuous trades, with volume capped at MIC traded volume (§5.3.2). A real asset trades at its own prices.
- Concentrated inputs. Each input comes from a single publisher: ESIOS for the day-ahead price, which it republishes from OMIE, and for all balancing and ancillary data; OMIE for the ICM price index and MIC traded volume. An error or change at that source flows into the Index (§4.2).
- One asset design per duration. 50 MW at 1, 2 or 4 hours, full grid connection, no grid fees or IVPEE, no degradation, and 0% state of charge at midnight (§2.2, §5.5). The revenue streams in §3.2, such as capacity payments and bilateral contracts, are not included.
- Coarser timing in parts of the history. Before 18 March 2025 the model reads markets that already cleared every 15 minutes at the first quarter-hour of each hour (§5.3). Since 1 October 2025 it holds TTRR P2 positions for a whole hour although the product clears every 15 minutes (§5.7).
- Changing market design. The history spans the SRS reform, the move to 15-minute intraday and day-ahead markets, and the connection to MARI and PICASSO (§2.6). Values before and after these dates are not fully comparable. Before 20 November 2024, aFRR revenues rely on the symmetric-band fallback.
Appendix I: Methodology changes
Methodology versions are recorded here, with their effective date and classification under §7.2.
| Version | Effective date | Change | Classification | Description |
|---|---|---|---|---|
| 0.1 | 27 May 2026 | First version | – | First version of the methodology for the ME BESS ES Indices (1H, 2H and 4H), now ME vBESS ES, based on GDM backtest revenues. Day-ahead, intraday, real-time, aFRR capacity, aFRRE, mFRR, and TTRR P2 activated energy modelled. No post-hoc calibration factor applied. Symmetric-band fallback on pre-20 November 2024 aFRR / aFRRE. |
| 0.4 | 6 August 2026 | Size-aware market participation | Material, disclosed as material after the fact | Participation in aFRR capacity, aFRRE, mFRR and TTRR P2 is now capped by a size-aware capture rate, measured against the depth of each market and direction (§5.6.1). This replaces a cap based on an estimated battery fleet, and measures all competing technologies rather than batteries alone. A participation ceiling of 30% of rated power applies to aFRR capacity and to TTRR P2 upward. aFRR capacity revenue is stated in EUR/MW/h. Index values are restated across the published history. |
| 0.5 | 23 October 2026 | Revision of the methodology document | Non-material | Restructured the document. Added definitions, a parameter table with the market depths and price-taker thresholds, minimum data, data-quality rules, a definition of material change and limitations. Renamed the family ME vBESS ES. Aligned the description of the model, the market milestones and the data sources with the model version that produces the published Index. No change to Index values. |
Versions 0.2 (11 June 2026) and 0.3 (18 June 2026) were revisions made before first publication on 2 July 2026.
Disclaimer
This document, including the methodologies and indices described herein, is the proprietary work of MODO ENERGY LIMITED ("Modo Energy") and is provided solely for informational purposes. These indices are designed for use in financial analysis, benchmarking, and decision-making. However, they do not constitute investment advice or a recommendation regarding any specific financial instrument, asset, or strategy.
While Modo Energy strives to ensure the accuracy, reliability, and transparency of the indices and methodologies, all information is provided "as is", without any express or implied warranties, including but not limited to warranties of merchantability or fitness for a particular purpose. Users should be aware that the indices are derived from publicly available market data that may be subject to revisions, delays, or inaccuracies, and that the ME vBESS ES Indices are simulated from a representative asset rather than observed from underlying transactions. Past performance is not indicative of future results, and external factors such as regulatory changes, market conditions, and asset-specific characteristics may impact index performance.
Modo Energy encourages users to conduct their own due diligence and consult with qualified financial professionals before making any investment or operational decisions based on the indices or methodologies herein. Modo Energy disclaims any liability for direct, indirect, incidental, or consequential losses or damages arising from the use of the indices, methodologies, or related data.
It is not possible to invest directly in an index. Indices are intended to represent performance benchmarks, and exposure to an asset class represented by an index may be available only through separate investable instruments. Modo Energy does not sponsor, endorse, or manage any financial products that aim to track the performance of its indices.
All intellectual property rights to the indices and methodologies are owned by Modo Energy. Unauthorised use, reproduction, or redistribution of this document, in whole or in part, is strictly prohibited without prior written consent from Modo Energy.
This document and the indices it describes are subject to updates and revisions. Material changes are communicated in line with §7.2. For further information, including licensing enquiries, please contact Modo Energy directly.
By accessing or using this document, you acknowledge and accept the terms of this disclaimer.