Last updated: 12 November 2026
MISO Methodology
Modo Energy provides benchmark data for battery energy storage systems across global energy markets, applying a standardized methodology to ensure consistency and transparency across all produced Indices.
1. Introduction
The Modo Energy MISO Methodology sets out how Modo Energy's battery energy storage benchmarks for the Midcontinent Independent System Operator (MISO) are constructed. It explains:
- what the Benchmarks measure and why this method is used (§1);
- the key terms used (§2);
- the representative asset and how values are calculated (§3);
- the revenue components included (§4);
- the data inputs, fallbacks and minimum data requirements (§5);
- the dispatch model (§6);
- how expert judgment is exercised (§7);
- how the Benchmarks are determined when data is missing or markets are disrupted (§8);
- when published values may be revised (§9);
- how the methodology is reviewed and changed (§10–11);
- and the Benchmarks' limitations (§12).
1.1 What the MISO Benchmark represents
The ME BESS MISO Benchmarks measure the simulated market revenue of a representative grid-scale lithium-ion BESS in MISO, expressed per MW of rated power. The family of benchmarks is grouped by location and system duration so revenues can be compared across the MISO footprint and across battery configurations.
Each Benchmark reflects revenue a representative asset could earn from MISO's energy and ancillary service markets rather than a measurement of any individual operator.
1.2 Why MISO requires a simulated benchmark
The MISO Benchmark is simulated, not measured.
MISO does not publish the asset-level data needed to account for the operations and revenues of individual batteries on its grid. It publishes market clearing prices for energy (locational marginal prices, LMPs) and for each ancillary service (market clearing prices, MCPs), but not per-asset dispatch, awards or revenue. By contrast, ERCOT publishes the ancillary service awards and telemetered net output of individual units, which allows Modo Energy to construct measured benchmarks for ERCOT.
1.3 Why this method is used
In the absence of asset-level data, the most direct way to estimate what a battery could earn in MISO is to simulate a battery trading against the prices MISO actually published. Modo Energy does this with its Global Dispatch Model (GDM), a mixed-integer linear program (MILP) that maximizes battery revenue subject to market rules and physical constraints (§6). This approach:
- uses only public MISO price data, so every input can be traced to a MISO publication;
- applies a fixed, disclosed asset specification, so changes in Benchmark values reflect changes in market prices rather than changes in the asset or its operator; and
- uses the same model and structure as Modo Energy's simulated benchmarks in other markets, so MISO values can be compared with them.
Because the model optimizes with perfect knowledge of the day's prices, its raw output overstates what a real operator would earn. A calibration factor is applied to account for this (§6.6).
2. Definitions
| Term | Definition |
|---|---|
| Benchmark | An ME vBESS MISO Benchmark, as listed in §3.1 |
| BESS | Battery energy storage system |
| Rated Power | The maximum instantaneous power discharge of the battery, in MW |
| Duration | The number of hours the representative asset can discharge at its rated power |
| Energy capacity | The product of rated power and duration, measured in MWh |
| State of Charge (SoC) | The energy stored in the battery at a point in time. |
| Round-trip efficiency (RTE) | The share of energy imported from the grid that can later be discharged. |
| Operating day | A calendar day in MISO local time (Central Prevailing Time) |
| Day-ahead (DA) market | MISO's day-ahead market, which co-optimizes energy and ancillary services and clears hourly. |
| Real-time (RT) market | MISO's real-time market, which dispatches energy at 5-minute intervals and co-optimizes ancillary services. |
| Pricing node or node | The MISO pricing node whose LMP is used for a Benchmark (§5.2) |
| LMP | Locational marginal price: the price of energy at a MISO pricing node, in nominal USD/MWh |
| MCP | Market clearing price for an ancillary service, in USD/MW/h |
| LRZ | One of MISO's ten "Local Resource Zone"s, labeled LRZ1-LRZ10. Spinning and Supplemental Reserve prices are applied by zone (§5.2) |
| Ancillary service | A reserve product procured by MISO and modeled here: Regulation, Spinning Reserve and Supplemental Reserve |
| Capacity product | A product paid per MW of capacity held each interval, in nominal USD/MW/h, rather than per MWh of energy delivered |
| Expected throughput | The assumed share of ancillary capacity held that is actually exported or imported as energy within an interval (§5.4) |
| Perfect foresight | The optimization engine knows all prices for the operating day when it makes its dispatch decisions |
| Minimum spread | A per-MWh cost on discharge used in the optimization only, to stop the model trading marginal price spreads (§3.2) |
| Calibration factor | A fixed multiplier applied to simulated revenue to account for the difference between perfect-foresight and realized revenue (§6.6) |
3. Benchmark construction
This section details the parameters that define the simulated battery in a Modo Energy virtual asset benchmark. The default values for those parameters in the ME vBESS MISO Benchmarks are also provided.
3.1 The ME vBESS MISO Benchmarks
Modo Energy produces a family of nine benchmarks for MISO. The benchmarks vary in the duration and pricing node of the simulated battery:
- The durations are: 1-, 2-, and 4-hours
- The settlement locations are the three LRZs determined by Modo Energy to be the best suitable regions for grid-scale BESS: LRZ1, LRZ3, and LRZ9.
The naming convention for this family of benchmarks is ME vBESS MISO [pricing node] ([duration]H) — for example, the 2-hour benchmark for the 9th LRZ is "ME vBESS MISO LRZ9 (2H)".
This family of benchmarks are produced using the methodology described in this document, with a common set of operational and behavioral parameters. These parameters are specified below.
3.2 Representative vBESS specification
These parameters are set by Modo Energy, and are under the purview of the US modeling team. They define the representative asset and the behavior of the dispatch model. No input data (prices) are modified.
| Parameter | Value | Rationale |
|---|---|---|
| Rated power | 100 megawatts | Representative of utility-scale BESS in the MISO interconnection queue and recently commissioned assets. |
| Round-trip efficiency | 88% | AC-AC efficiency representative of current lithium-ion BESS. Applied to charging flow. |
| Max cycles per day | 1.0 | Representative contractual warranty for current deployments. |
| Usable state-of-charge window | 0% – 100% | The full usable energy capacity available to the optimization engine. |
| Cell degradation | Disabled | Keeps duration constant across the full history for comparability. Can be enabled in custom benchmarks. |
| Grid import/export limit | Equal to rated power (100 MW) | No grid connection restrictions are assumed. |
| AS expected throughput | See §5.4 | Per-service activation data. |
| Calibration factor | 80% | Accounts for the gap between perfect-foresight & realized revenues (§6.6). |
| Start- & end-of-day SoC | 0% | Each operating day is solved independently and days are comparable. |
| Minimum spread | 10 USD/MWh | Stops the model cycling for marginal spreads a real operator would not trade. Used in the optimization only; not deducted from revenue. |
All parameters listed in §3.1 and §3.2 are customizable in user-defined vBESS benchmarks, with the exception of AS expected throughput and calibration factor.
3.3 How the Benchmark is calculated
For each operating day, the Benchmark is calculated by:
- Running the GDM for the operating day using the representative asset (§3.2) and the input data (§5).
- Computing simulated revenue in each modeled market, in nominal USD, as the cleared price multiplied by the simulated position in each interval.
- Multiplying revenue in every energy and ancillary market by the calibration factor of 80% (§6.6).
- Summing revenue across markets and dividing by rated power (100 MW) to give a value in USD/MW for the operating day.
Values for longer periods (for example, a month) are the sum of the daily values in that period.
3.4 Benchmark value representation
All Benchmark values are reported as revenue per unit of rated power, in the following units:
- USD/MW (period): total Benchmark revenue for the period (e.g. USD/MW/month).
- USD/MW/year (annualized): period revenue divided by the number of days in the period and multiplied by 365.
3.5 Publication cadence
The Benchmarks are updated daily. Modo Energy ingests MISO day-ahead and real-time energy and ancillary service clearing prices and publishes for the most recent operating day for which the minimum data in §5.5 is available, after a short lag to allow for MISO settlement and late postings.
3.6 Market evolution reflected in the Benchmark
| Milestone | Effective | Impact |
|---|---|---|
| MISO energy markets go-live: day-ahead and real-time energy with LMP pricing. | 1 Apr 2005 | Energy prices available from this date. |
| MISO Ancillary Services Market go-live: co-optimized Regulation, Spinning and Supplemental Reserve. | 6 Jan 2009 | Ancillary prices available from this date. |
| Short-Term Reserve (STR) introduced. | 2022 | Not modeled (§4.2). |
| GDM MISO market coverage begins. | 1 Jan 2025 | All energy and ancillary markets are modeled from this date. |
4. Revenue Components
Modo Energy's virtual asset BESS benchmarks for MISO only consider wholesale revenue opportunities: energy and ancillary service. Capacity contracts, PPAs, or other contracted arrangements are not considered.
4.1 Revenue components included in the Benchmarks
| Market | Source | Direction | Price signal |
|---|---|---|---|
| Day-Ahead Energy | MISO day-ahead market | Charge and discharge | Hourly LMP at the location's trading hub (USD/MWh) |
| Real-Time Energy | MISO real-time market | Charge and discharge | 5-minute LMP at the location's trading hub (USD/MWh) |
| Regulation | MISO day-ahead and real-time markets | Charge and discharge (symmetric) | Hourly & 5-min MISO-wide MCP (USD/MW/h) |
| Spinning Reserve | MISO day-ahead and real-time markets | Discharge | Hourly & 5-min MCP for the location's zone (USD/MW/h) |
| Supplemental Reserve | MISO day-ahead and real-time markets | Discharge | Hourly & 5-min MCP for the location's zone (USD/MW/h) |
All ancillary products are capacity products: the battery is paid per MW of reserve held. Regulation is offered symmetrically: the battery holds equal upward and downward capacity and is paid the single Regulation MCP once. Spinning and Supplemental are upward reserves. Energy delivered when a service is deployed moves the battery's state of charge and counts toward cycling (§6.5), but only the capacity payment is counted as revenue.
4.2 Excluded revenues and costs
- Short-term reserve (STR): not modeled.
- Ramp capability product (up/down): not modeled.
- Energy settlement of ancillary deployments: deployed energy affects SoC but is not separately settled.
- Capacity / resource adequacy payments (Planning Resource Auction): cleared in MISO's seasonal auction rather than a continuously cleared market; not included in the Benchmark.
- Financial transmission rights / congestion hedging: portfolio-specific; not modeled.
- Curtailment compensation: site-specific; not modeled.
- Network / transmission access charges: site-specific; set to zero.
- Bilateral contracts (PPAs, tolls, floors): not modeled.
- Operator fees, warranty, O&M: the Benchmark reports gross market revenue, not net of operating costs.
5. Data Inputs
5.1 Inputs and sources
The Benchmark uses four datasets, all published by MISO through the MISO Data Exchange. No other data sources are used for prices.
| Input | Source | Granularity | Applied at |
|---|---|---|---|
| Day-ahead LMP | MISO DA market LMPs | Hourly | Pricing node |
| Real-time LMP | MISO RT market LMPs | 5-minute | Pricing node |
| Day-ahead ancillary MCPs | MISO DA ancillary service MCP | Hourly | Zone (Regulation: MISO-wide) |
| Real-time ancillary MCPs | MISO RT ancillary service MCP | 5-minute | Zone (Regulation: MISO-wide) |
In addition, the model uses the parameters in §3.2, the expected-throughput values in §5.4, and a mapping published by MISO from pricing nodes to utilities and Local Resource Zones.
5.2 Locations, hubs and reserve zones
MISO energy prices are nodal; ancillary prices are not. Each published location takes energy prices from a trading hub and Spinning and Supplemental Reserve prices from its Local Resource Zone. Regulation clears at a single MISO-wide price. In the reserve price data, the MISO South zones (LRZ8–LRZ10) share a single MISO South value.
| Location | Energy (LMP) | Reserves (Spin / Supp) |
|---|---|---|
| Minnesota/Dakotas (LRZ1) | MINN.HUB | LRZ1 |
| Iowa (LRZ3) | MINN.HUB | LRZ3 |
| Louisiana/Texas (LRZ9) | LOUISIANA.HUB | LRZ9 (MISO South) |
5.3 How inputs are combined
- MISO publishes market data in Eastern Standard Time (UTC−05:00). All inputs are converted to Eastern Prevailing Time and aligned to a common 5-minute grid. Hourly prices apply to each 5-minute interval within their hour.
- Energy and ancillary prices are used as published by MISO. Modo Energy does not cap, filter or adjust prices, including during scarcity events.
- Revenue from each market is computed separately and then summed (§3.3).
5.4 Ancillary expected throughput
MISO does not publish per-service activation data suitable for the representative asset. The model applies fixed expected-throughput values to translate ancillary capacity held into energy that moves SOC and counts toward cycling (§6.5). The values are conservative estimates, derived as reductions from the activation rates of comparable ERCOT services, and do not vary by time of day.
| Service (DA and RT) | Expected throughput |
|---|---|
| Regulation (each direction) | 10% |
| Spinning Reserve | 0.3% |
| Supplemental Reserve | 0.1% |
5.5 Data priority, fallbacks and minimum data
- Priority. MISO-published prices are the only price source. MISO labels real-time prices as preliminary for a short period before they are finalized; the latest version available when the Benchmark is computed is used.
- Gaps within a day. Where an interval is missing from an otherwise available dataset, the most recent preceding value is used (or, at the start of a day, the following value).
- Minimum data. A Benchmark value is only determined for an operating day when all four datasets in §5.1 are available for that day at the location's hub and zone. If any dataset is absent for the day, no value is published for that day until the data becomes available.
6. Modeling Methodology
6.1 What the model solves
The GDM answers one question: given the prices observed on a given day and the physical and regulatory limits of the asset, what is the highest revenue a well-run battery could have earned?
It allocates the battery's power and stored energy across energy (day-ahead and real-time) and ancillary capacity (Regulation, Spinning Reserve and Supplemental Reserve). Revenue is the sum of these streams net of charging cost, subject to the constraints in §6.3–6.5.
6.2 Two-step optimization
- Day-ahead step (60-minute granularity): day-ahead energy and the three ancillary products are optimized together, mirroring MISO's co-optimized day-ahead market. The resulting positions are committed.
- Real-time energy step (5-minute granularity): holding the day-ahead positions fixed, the model co-optimizes real-time energy and the three real-time ancillary products, within the asset's remaining headroom.
Each step covers one operating day. The model has perfect foresight of energy and ancillary prices over the operating day.
6.3 Market stacking and physical limits
- Power headroom: the sum of discharging ancillary positions (upward Regulation, Spinning, Supplemental) cannot exceed rated power, and nor can downward Regulation.
- Energy headroom: each ancillary position must be backed by enough stored energy (or, for downward Regulation, enough empty capacity) to deliver at full power for 1 hour, consistent with MISO's deployment requirements (Business Practices Manual 002).
- Grid limits: combined charge and discharge cannot exceed the 100 MW import and export limits.
- Daily cycling cap: total discharge throughput per day, including energy delivered through ancillary deployment, cannot exceed 1.0 cycles of usable capacity.
6.4 The battery's physical arrangement
- Round-trip efficiency (88%) is applied to charging: 1 MWh drawn stores 0.88 MWh.
- State of charge in each interval equals the previous level plus charging (net of efficiency) minus discharging, plus the expected energy flow from ancillary deployment (§6.5). The net flow within an interval is used, so offsetting trades within an interval incur no efficiency loss.
- SOC window is 0%–100%, starting and ending each operating day at 0%.
- Minimum spread of 10 USD/MWh is applied to discharge in the objective only.
- Degradation is disabled.
6.5 Capacity vs deployed energy
The battery is paid the cleared capacity price (USD/MW/h) for each MW of ancillary capacity held. Holding capacity reduces the power and energy available to the energy markets. The energy actually deployed against a capacity award varies by asset, day and time, and is not observable in MISO public data. The model therefore moves SOC by the held capacity multiplied by the expected throughput for that service (§5.4). That energy counts toward cycling but is not separately remunerated.
6.6 Revenue calibration
A flat calibration factor of 80% is applied to simulated revenue from every energy and ancillary market. The factor accounts for the gap between perfect-foresight modeled revenue and what a real battery earns, which has three sources:
- Foresight: the model sees prices a real trader does not have when offers are submitted.
- Availability: real assets have outages and maintenance; the representative asset is always available.
- Execution: trading frictions and slippage.
The value of 80% is the factor Modo Energy uses across its Eastern US benchmarks. It is informed by comparing perfect-foresight GDM revenues with realized revenues in markets where asset-level data is published: ERCOT and Great Britain. It is applied after dispatch is optimized, so it does not change dispatch or the trade-offs between markets; it scales the result.
7. Expert Judgement
MISO does not publish sufficient data to precisely model all aspects of a battery's operations. Within these gaps, expert judgement and market knowledge are used in place of empirical data. This section documents the modeling assumptions that inform the ME vBESS MISO Benchmarks.
7.1 Where judgment is exercised
The Benchmark is determined by the model from published prices; there is no discretionary adjustment of individual daily values. Expert judgment is exercised in setting the methodology itself, specifically:
- the representative asset specification and minimum spread (§3.2);
- the choice of locations and the pricing location used to price each one (§5.2);
- the ancillary expected-throughput values (§5.4); and
- the calibration factor (§6.6).
7.2 Keeping judgment consistent
These parameters are fixed in the GDM's version-controlled codebase and applied identically to every operating day and every MISO Benchmark. A parameter is changed only through a code change that is reviewed by a member of Modo Energy's modeling team other than its author and passes automated tests before release. Changes to parameters are treated as methodology changes under §11.
8. Market stress, disruption and missing data
Modo Energy's current practice is:
- Late or missing data. Where MISO data for an operating day is late or incomplete, Modo Energy waits for the data rather than estimating it. No value is published for that day until the minimum data in §5.5 is available.
- Extreme prices. Prices during scarcity, stress or other extreme events are used as published. The Benchmark is intended to reflect those conditions, so they are not removed or capped.
- Market suspension or rule changes. If MISO suspends a market or changes its design, the Benchmark reflects the prices MISO publishes for the affected period. Changes to the methodology needed in response are handled under §11.
9. Revisions to published values
Published values may be revised, for example where:
- an error is identified in Modo Energy's processing of the input data; or
- a methodology change (§11) is applied to historical periods.
10. Methodology review
The methodology is reviewed internally by Modo Energy, including when MISO changes its market design (for example, if Short-Term Reserve or the Ramp Capability Product are considered for inclusion), when new data becomes available (for example, MISO-specific ancillary activation data), or when changes are made to the GDM. Any changes that result from a review are made under §11.
11. Methodology changes
Changes are classified as material or non-material. A change is material where it may meaningfully affect benchmark values, the inputs used, or what the benchmark measures. Material changes are announced with not less than 30 days' written notice before they take effect, together with an impact analysis.
Non-material changes are corrections and clarifications that do not alter the substance of the methodology. They may be made without prior consultation and are disclosed as soon as practicable.
Emergency changes needed to protect the integrity of the benchmark or to comply with law may be made without prior consultation, with notice given as promptly as circumstances permit.
All changes are recorded, with their effective date, in the change log (Appendix I).
12. Limitations
- Simulated, not observed. The Benchmark is not derived from transactions or the revenues of any real asset in MISO, and cannot be validated directly against MISO asset revenues because MISO does not publish them.
- Foresight and calibration. The model optimizes with perfect foresight. The 80% calibration factor is a single flat value derived from ERCOT and Great Britain, not from MISO. Actual foresight losses vary over time and between markets.
- Price-taker assumption. The representative asset is assumed not to affect prices and can clear its full offered capacity in any market. MISO's regulation and reserve requirements are small relative to its energy market, so in practice a single asset or a growing battery fleet may not clear the volumes modeled or may depress clearing prices. The Benchmark may overstate ancillary revenue where markets are thin or concentrated.
- Excluded products. Short-Term Reserve and the Ramp Capability Product are not modeled, so revenue available from them is not captured.
- Ancillary activation. Expected-throughput values are derived from ERCOT, not MISO, and do not vary by time of day.
- Short history. The model covers MISO markets from January 2025, which limits long-run comparison.
- Asset assumptions. The asset is always available, does not degrade, and starts and ends each day empty. Real assets differ on each point.
- Excluded revenues. The revenues and costs listed in §4.2, including capacity market revenue, are not captured.
Appendix I — Change log
| Change | Effective | Previous methodology | Updated methodology | Version |
|---|---|---|---|---|
| Initial publication | July 2026 | - | First publication of the ME BESS MISO benchmarks from GDM backtest revenues. Day-ahead and real-time energy plus regulation, spinning, and supplemental reserves co-optimised in the day-ahead and real-time markets. | 0.1 |
| Restructured to follow IOSCO Principle 11 (non-material) | October 23, 2026 | Version 0.1 document structure. | Added rationale, definitions, parameter owners, data fallbacks and minimum data, expert judgment, market disruption, revisions, change classification and limitations sections. Added the 10 USD/MWh minimum spread and start- and end-of-day state of charge. No change to how Benchmark values are calculated. | 1.0 |
Disclaimer
This document, including the methodologies and benchmarks described herein, is the proprietary work of MODO ENERGY LIMITED ("Modo Energy") and is provided solely for informational purposes. These benchmarks are designed for use in financial analysis, benchmarking, and decision-making. However, they do not constitute investment advice or a recommendation regarding any specific financial instrument, asset, or strategy.
While Modo Energy strives to ensure the accuracy, reliability, and transparency of the benchmarks and methodologies, all information is provided "as is", without any express or implied warranties, including but not limited to warranties of merchantability or fitness for a particular purpose. Users should be aware that the benchmarks are derived from publicly available market data that may be subject to revisions, delays, or inaccuracies, and that the MISO Benchmarks are simulated from a representative asset rather than observed from underlying transactions. Past performance is not indicative of future results, and external factors such as regulatory changes, market conditions, and asset-specific characteristics may impact benchmark performance.
Modo Energy encourages users to conduct their own due diligence and consult with qualified financial professionals before making any investment or operational decisions based on the benchmarks or methodologies herein. Modo Energy disclaims any liability for direct, indirect, incidental, or consequential losses or damages arising from the use of the benchmarks, methodologies, or related data.
It is not possible to invest directly in a benchmark. Benchmarks are intended to represent performance references, and exposure to an asset class represented by a benchmark may be available only through separate investable instruments. Modo Energy does not sponsor, endorse, or manage any financial products that aim to track the performance of its benchmarks.
All intellectual property rights to the benchmarks and methodologies are owned by Modo Energy. Unauthorised use, reproduction, or redistribution of this document, in whole or in part, is strictly prohibited without prior written consent from Modo Energy.
This document and the benchmarks it describes are subject to updates and revisions. For further information, including licensing inquiries, please contact Modo Energy directly.
By accessing or using this document, you acknowledge and accept the terms of this disclaimer.